SourcingAI
Try for free
Powered by Made-in-China.com
6061-T6 Aluminum Formwork for Rapid Construction From Manufacturer
US$50.00-100.00
1 Square Meter

Product profile

Customization

Available

After-sales Service

Available

Warranty

1 Years

Model NO.

MP

Certification

ISO, CE

Material

Steel

Type

Wall Formwork

Code

6061-T6

Construction Period

5 Days

Load Capacity

60kn

After Sale Service

Available

Transport Package

Standard

Trademark

MACPEX

Origin

China

HS Code

8480411000

Production Capacity

50000

Key features

Rapid Construction Speed: Construction period is 3-5 days per storey, significantly accelerating project timelines.
No Plastering Required: Smooth surface after removal eliminates the need for plastering, saving cleaning and labor costs.
High Load Capacity: Supports 60 KN per square meter, ensuring stability and preventing formwork shifting.
Reusable & Cost Effective: Scrap value is about 50% of the new panel, offering significant long-term economic benefits.
Easy Installation: Workers can easily learn to install and dismantle after a short training period.
Crane Efficiency: Does not require crane for shifting and assembly, allowing crane to be used for other activities.
Versatile Application: Suitable for walls, stairs, columns, slabs, and tables with customizable designs.
Certified Quality: Products are ISO and CE certified, ensuring high quality and safety standards.

Company profile

SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.
High Repeat Buyers ChoiceFast DeliveryProduct CertificationFlexible Customization
Business Type: Manufacturer/Factory, Group CorporationAverage Response Time: ≤3.75h

About Our Factory & Business Background

AddressLu Jia Cun Industrial Park, Qingdao, Shandong, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: 1-3 months

Our Production Capability & Technical Expertise

Main ProductsConcrete Batching Plant, Concrete Pipe Making Machine, Dry Mortar Mix Plant, Concrete Twin Shaft Mixer, Asphalt Mixing Plant, Asphalt Mixer, Self Loading Concrete Mixer, Pumps

Our Industry Experience & Global Business Record

Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe

Product Q&A

Q:What is the construction period for this formwork?
A:
The construction period is 3-5 days per storey.
Q:Is plastering required after removing the formwork?
A:
No, the smooth effect after removing the formwork means there is no need to plaster.
Q:What is the load capacity of the aluminum formwork?
A:
The load capacity is 60 KN per square meter.
Q:Does the installation require a crane?
A:
No, it does not require a crane for shifting and assembly.
Q:What is the scrap value of the formwork?
A:
The scrap value is about 50% of the new panel.

Send Inquiry

*To:SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

6061-T6 Aluminum Formwork for Quick Construction

6061-T6 Aluminum Formwork for Quick Construction

US$50.00-100.00
1 Square Meter(MOQ)
Made-in-China.com
Korea Aluminum Formwork System for Concrete Construction
Made-in-China.com
6061-T6 Aluminum Formwork for Concrete Works Construction
Made-in-China.com
6061-T6 Aluminum Alloy Formwork System for Concrete Construction
Made-in-China.com