SourcingAI
Try for free
Powered by Made-in-China.com
Aluminum Formwork for Efficient and Precise Concrete Construction Hot Sale
US$50.00-100.00
1 Square Meter

Product profile

Customization

Available

After-sales Service

Available

Warranty

1 Years

Model NO.

MP

Certification

ISO, CE

Material

Steel

Type

Wall Formwork

Code

6061-T6

Construction Period

5 Days

Load Capacity

60kn

After Sale Service

Available

Transport Package

Standard

Trademark

MACPEX

Origin

China

HS Code

8480411000

Production Capacity

50000

Key features

High Load Capacity: Supports 60 KN per square meter for stability and uniform load distribution.
Fast Construction Speed: Installation takes only 3-5 days per storey with minimal training required.
No Plastering Needed: Smooth surface after removal eliminates the need for additional plastering costs.
Cost-Effective Scrap Value: Scrap value is approximately 50% of the new panel price.
Crane-Free Assembly: Does not require a crane for shifting, allowing crane use for other tasks.
Durable Material: Made from high-strength Aluminium alloy 6061-T6 to prevent bursting.
Certified Quality: Complies with ISO and CE certification standards for safety and reliability.
Versatile Application: Suitable for walls, stairs, columns, slabs, and beams in concrete construction.

Company profile

SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.
High Repeat Buyers ChoiceFast DeliveryProduct CertificationFlexible Customization
Business Type: Manufacturer/Factory, Group CorporationAverage Response Time: ≤4.13h

About Our Factory & Business Background

AddressLu Jia Cun Industrial Park, Qingdao, Shandong, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: 1-3 months

Our Production Capability & Technical Expertise

Main ProductsConcrete Batching Plant, Concrete Pipe Making Machine, Dry Mortar Mix Plant, Concrete Twin Shaft Mixer, Asphalt Mixing Plant, Asphalt Mixer, Self Loading Concrete Mixer, Pumps

Our Industry Experience & Global Business Record

Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe

Product Q&A

Q:What is the material of the formwork?
A:
The formwork is made from Aluminium alloy 6061-T6, ensuring high strength and durability.
Q:How long does the installation take?
A:
Construction period is 3-5 days per storey. Workers can easily learn to install and dismantle it after a short training period.
Q:Is a crane required for assembly?
A:
No, the system does not require a crane for shifting and assembly, allowing the crane to be used for other activities.
Q:What is the load capacity?
A:
The load capacity is 60 KN per square meter, ensuring good integrality and uniform load distribution.
Q:Do I need to plaster after removing the formwork?
A:
No, the smooth effect after removing the formwork means there is no need for plastering, saving cleaning and plastering costs.

Send Inquiry

*To:SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like