SourcingAI
Try for free
Powered by Made-in-China.com
Aluminum Formwork for Precise and Efficient Concrete Construction Processes
US$50.00-100.00
1 Square Meter

Product profile

Customization

Available

After-sales Service

Available

Warranty

1 Years

Model NO.

MP

Certification

ISO, CE

Material

Steel

Type

Wall Formwork

Code

6061-T6

Construction Period

5 Days

Load Capacity

60kn

After Sale Service

Available

Transport Package

Standard

Trademark

MACPEX

Origin

China

HS Code

8480411000

Production Capacity

50000

Key features

Cost-Effective Plastering: Smooth surface after removal eliminates the need for plastering, saving cleaning and material costs.
High Load Capacity: Supports 60 KN per square meter, ensuring stability and uniform load distribution during construction.
Rapid Construction: Construction period is 3-5 days per storey, enabling fast and efficient building processes.
Easy Assembly: Workers can easily learn installation after short training; no crane required for shifting and assembly.
High Scrap Value: Scrap value is approximately 50% of the new panel price, offering significant residual value.
Durable Material: Made from high-quality Aluminium alloy 6061-T6, firm enough to prevent bursting and shifting.
Versatile Application: Ideal for wall, stair, and column construction with options for panel, H20, and steel prop formwork.
Certified Quality: Product holds ISO and CE certifications, ensuring compliance with international quality standards.

Company profile

SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.
High Repeat Buyers ChoiceFast DeliveryProduct CertificationFlexible Customization
Business Type: Manufacturer/Factory, Group CorporationAverage Response Time: ≤4.91h

About Our Factory & Business Background

AddressLu Jia Cun Industrial Park, Qingdao, Shandong, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: 1-3 months

Our Production Capability & Technical Expertise

Main ProductsConcrete Batching Plant, Concrete Pipe Making Machine, Dry Mortar Mix Plant, Concrete Twin Shaft Mixer, Asphalt Mixing Plant, Asphalt Mixer, Self Loading Concrete Mixer, Pumps

Our Industry Experience & Global Business Record

Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe

Product Q&A

Q:What is the material of the formwork?
A:
The formwork is made from Aluminium alloy 6061-T6, which is durable and firm.
Q:How long does the construction take per storey?
A:
The construction period is typically 3-5 days per storey.
Q:Is crane assistance required for installation?
A:
No, the system does not require a crane for shifting and assembly, allowing the crane to be used for other activities.
Q:What is the load capacity of the formwork?
A:
The load capacity is 60 KN per square meter, ensuring good integrality and uniform load.
Q:Do I need to plaster the concrete after removing the formwork?
A:
No, the smooth effect after removing the formwork means there is no need for plastering.

Send Inquiry

*To:SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like