SourcingAI
Try for free
Powered by Made-in-China.com
Aluminum Formwork for Quick and Precise Concrete Construction
US$50.00-100.00
1 Square Meter

Product profile

Customization

Available

After-sales Service

Available

Warranty

1 Years

Model NO.

MP

Certification

ISO, CE

Material

Steel

Type

Wall Formwork

Code

6061-T6

Construction Period

5 Days

Load Capacity

60kn

After Sale Service

Available

Transport Package

Standard

Trademark

MACPEX

Origin

China

HS Code

8480411000

Production Capacity

50000

Key features

Fast Construction Speed: 3-5 days construction period per storey with easy installation after short training.
High Load Capacity: Supports 60 KN per square meter ensuring stability and uniform load distribution.
No Plastering Required: Smooth surface finish after removal eliminates the need for additional plastering costs.
Cost-Effective Scrap Value: High scrap value of approximately 50% of the new panel price.
Crane-Free Assembly: Does not require crane for shifting and assembly, optimizing crane usage for other tasks.
Durable Material: Made from high-quality Aluminium alloy 6061-T6 for firmness and durability.
Certified Quality: ISO and CE certified ensuring reliable and secure construction standards.
Versatile Application: Suitable for columns, slabs, walls, stairs, and monolithic casting projects.

Company profile

Business Type: Manufacturer/Factory, Group CorporationAverage Response Time: ≤5.94h

About Our Factory & Business Background

AddressLu Jia Cun Industrial Park, Qingdao, Shandong, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: 1-3 months

Our Production Capability & Technical Expertise

Main ProductsConcrete Batching Plant, Concrete Pipe Making Machine, Dry Mortar Mix Plant, Concrete Twin Shaft Mixer, Asphalt Mixing Plant, Asphalt Mixer, Self Loading Concrete Mixer, Pumps

Our Industry Experience & Global Business Record

Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe

Product Q&A

Q:What is the material of the formwork?
A:
The formwork is made from high-quality Aluminium alloy 6061-T6.
Q:How long does the construction take per storey?
A:
The construction period is 3-5 days per storey.
Q:Is crane assistance required for installation?
A:
No, the system does not require a crane for shifting and assembly.
Q:What is the load capacity of the formwork?
A:
The load capacity is 60 KN per square meter.
Q:Do I need to plaster after removing the formwork?
A:
No, the smooth effect after removing the formwork means there is no need to plaster.

Send Inquiry

*To:SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like