Powered by Made-in-China.com
Aluminum Stair Formwork for High Rise Building
US$50.00-100.00
1 Square Meter
Product profile
Customization
AvailableAfter-sales Service
AvailableWarranty
1 YearsModel NO.
MP deckCertification
ISO, CEMaterial
SteelType
Wall FormworkTransport Package
StandardTrademark
MACPEXOrigin
ChinaHS Code
8480411000Production Capacity
50000Key features
Fast Construction Speed: 3-5 days per storey with easy installation after short training.
No Crane Required: Does not require crane for shifting, allowing crane use for other activities.
Smooth Surface Finish: Smooth effect after removal eliminates the need for plastering.
High Load Capacity: Load capacity of 60 KN per square meter ensures stability and uniform load.
High Scrap Value: Scrap value is about 50% of the new panel cost.
Certified Quality: ISO and CE certified with firm structure that prevents bursting.
Company profile
Business Type: Manufacturer/Factory, Group CorporationAverage Response Time: ≤5.08h
About Our Factory & Business Background
AddressLu Jia Cun Industrial Park, Qingdao, Shandong, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: 1-3 months
Our Production Capability & Technical Expertise
Main ProductsConcrete Batching Plant, Concrete Pipe Making Machine, Dry Mortar Mix Plant, Concrete Twin Shaft Mixer, Asphalt Mixing Plant, Asphalt Mixer, Self Loading Concrete Mixer, Pumps
Our Industry Experience & Global Business Record
Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe
Product Q&A
Q:What is the warranty period?
A:
We provide a 1-year warranty for the aluminum stair formwork.
Q:What material is used for the formwork?
A:
The formwork is made of Aluminium alloy 6061-T6.
Q:Is a crane required for installation?
A:
No, the system does not require a crane for shifting and assembly.
Q:How long does it take to construct one storey?
A:
The construction period is typically 3-5 days per storey.
Q:Do I need to plaster the walls after removing the formwork?
A:
No, the smooth surface effect eliminates the need for plastering.
Send Inquiry
*To:
SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.
SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.*Content:
Supplier replies will be sent to your registered email
You may also like
High-Strength Aluminum Building Formwork for Fast Construction Projects
US$40.00
100 Square Meters(MOQ)
Customized Climbing Zulin Doka Steel Concrete Formwork Flat Form for High-Rise Building
US$3,000.00-10,000.00
10 Sets(MOQ)
Cast-in-Place Concrete Mould Suspension Cantilever Climbing Jump Formwork for High-Rise Building Construction
US$220.00-380.00
200 Square Meters(MOQ)
Climbing Formwork Zulin Hydraulic Power Flat Form for High-Rise Building
US$3,000.00-10,000.00
10 Sets(MOQ)
Fast Cycle Construction Concrete Formwork System for Large Scale Building Projects Aluminum Formworks
US$38.00-160.00
50 Square Meters(MOQ)
Customized Climbing Formwork Shuttering for High-Rise Building Skyscraper Tower Mall Hotel Concrete Mold
US$220.00-380.00
200 Square Meters(MOQ)
Suspension Cantilever Climbing Jump Shuttering Plywood Formwork for Concrete Mold High-Rise Building Construction
US$220.00-380.00
200 Square Meters(MOQ)
Modular Steel Formwork System Fast Assembly for High Rise Building Construction
US$38.00-160.00
50 Square Meters(MOQ)
Premium Recyclable Aluminum Formwork for Mic Modular Building Projects
US$38.00-160.00
50 Square Meters(MOQ)
Quality Steel Wood Simple Structure Metal Panels for Concrete Casting High Rise Building Formwork
US$55.00-101.00
500 Square Meters(MOQ)
Concrete Form Cantilever Climbing Jump Formwork for Concrete High-Rise Building Construction
US$220.00-380.00
200 Square Meters(MOQ)
Easy Lightweight Corrosion Resistant 6061-T6 Aluminum Scaffold Material Construction Concrete High-Rise Building Formwork
US$120.00-125.00
500 Square Meters(MOQ)
Beam Building Material Brace Hot DIP Galvanized Steel Beam System Formwork System for High Rise Building
US$88.00-161.00
1 Piece(MOQ)
New Assembled Aluminum Concrete Formwork Aluminum Concrete Formwork Panels for Top Building
US$39.00-101.00
50 Square Meters(MOQ)
Zulin Formwork Sale Climbing Scaffolding Flat Form for High-Rise Building with High Quality
US$3,000.00-10,000.00
10 Sets(MOQ)
Falsework Scaffolding System Components Formwork for Concrete in Construction of High Rise Building
US$85.00-300.00
1 Piece(MOQ)
Professional 20mm Durable Plastic Formwork for High Rise Building Applications
US$8.90-15.00
100 Pieces(MOQ)
PP Construction Formwork for High-Rise Building Concrete Fabrication
US$15.00-20.00
100 pieces(MOQ)



















