SourcingAI
Try for free
Powered by Made-in-China.com
Aluminum Stair Formwork for High Rise Building
US$50.00-100.00
1 Square Meter

Product profile

Customization

Available

After-sales Service

Available

Warranty

1 Years

Model NO.

MP deck

Certification

ISO, CE

Material

Steel

Type

Wall Formwork

Transport Package

Standard

Trademark

MACPEX

Origin

China

HS Code

8480411000

Production Capacity

50000

Key features

Fast Construction Speed: 3-5 days per storey with easy installation after short training.
No Crane Required: Does not require crane for shifting, allowing crane use for other activities.
Smooth Surface Finish: Smooth effect after removal eliminates the need for plastering.
High Load Capacity: Load capacity of 60 KN per square meter ensures stability and uniform load.
High Scrap Value: Scrap value is about 50% of the new panel cost.
Certified Quality: ISO and CE certified with firm structure that prevents bursting.

Company profile

SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.
High Repeat Buyers ChoiceFast DeliveryProduct CertificationFlexible Customization
Business Type: Manufacturer/Factory, Group CorporationAverage Response Time: ≤5.08h

About Our Factory & Business Background

AddressLu Jia Cun Industrial Park, Qingdao, Shandong, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: 1-3 months

Our Production Capability & Technical Expertise

Main ProductsConcrete Batching Plant, Concrete Pipe Making Machine, Dry Mortar Mix Plant, Concrete Twin Shaft Mixer, Asphalt Mixing Plant, Asphalt Mixer, Self Loading Concrete Mixer, Pumps

Our Industry Experience & Global Business Record

Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe

Product Q&A

Q:What is the warranty period?
A:
We provide a 1-year warranty for the aluminum stair formwork.
Q:What material is used for the formwork?
A:
The formwork is made of Aluminium alloy 6061-T6.
Q:Is a crane required for installation?
A:
No, the system does not require a crane for shifting and assembly.
Q:How long does it take to construct one storey?
A:
The construction period is typically 3-5 days per storey.
Q:Do I need to plaster the walls after removing the formwork?
A:
No, the smooth surface effect eliminates the need for plastering.

Send Inquiry

*To:SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like