SourcingAI
Try for free
Powered by Made-in-China.com
Aluminum Stair Formwork for High Rise Building by 6061-T6 Hot Sale
US$50.00-100.00
1 Square Meter

Product profile

Customization

Available

After-sales Service

Available

Warranty

1 Years

Model NO.

6061-T6

Certification

ISO, CE

Material

Steel

Type

Wall Formwork

Transport Package

Standard

Trademark

MACPEX

Origin

China

HS Code

8480411000

Production Capacity

50000

Key features

High Strength Material: Made from premium 6061-T6 aluminum alloy for superior durability.
Fast Construction Speed: Achieves 3-5 days per storey with easy installation and dismantling.
No Plastering Needed: Smooth surface finish eliminates the need for additional plastering costs.
High Load Capacity: Supports 60 KN per square meter with excellent stability and integrity.
Cost Effective Scrap Value: Scrap value is approximately 50% of the new panel cost.
Crane Efficiency: Does not require crane for assembly, allowing crane to be used for other tasks.
Certified Quality: ISO and CE certified ensuring high quality and safety standards.
Warranty Support: Comes with 1 year warranty and available after-sales service.

Company profile

SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.
High Repeat Buyers ChoiceFast DeliveryProduct CertificationFlexible Customization
Business Type: Manufacturer/Factory, Group CorporationAverage Response Time: ≤5.09h

About Our Factory & Business Background

AddressLu Jia Cun Industrial Park, Qingdao, Shandong, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: 1-3 months

Our Production Capability & Technical Expertise

Main ProductsConcrete Batching Plant, Concrete Pipe Making Machine, Dry Mortar Mix Plant, Concrete Twin Shaft Mixer, Asphalt Mixing Plant, Asphalt Mixer, Self Loading Concrete Mixer, Pumps

Our Industry Experience & Global Business Record

Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe

Product Q&A

Q:What material is used for the formwork?
A:
The formwork is made from high-quality aluminum alloy 6061-T6.
Q:How long does it take to construct one storey?
A:
The construction period is typically 3-5 days per storey.
Q:Is plastering required after removing the formwork?
A:
No, the smooth surface finish eliminates the need for plastering.
Q:What is the load capacity of the formwork?
A:
The load capacity is 60 KN per square meter.
Q:Do I need a crane for installation?
A:
No, the system does not require a crane for shifting and assembly.

Send Inquiry

*To:SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Formwork Aluminium for High-Rise Building

Formwork Aluminium for High-Rise Building

US$750.00-800.00
400 Square Meters(MOQ)
Made-in-China.com