SourcingAI
Try for free
Powered by Made-in-China.com
Casting Wall Stair Slab Column Robust Aluminum Formwork with 6061-T6
US$50.00-100.00
1 Square Meter

Product profile

Customization

Available

After-sales Service

Available

Warranty

1 Years

Model NO.

6061-T6

Certification

ISO, CE

Material

Steel

Type

Wall Formwork

Transport Package

Standard

Trademark

MACPEX

Origin

China

HS Code

8480411000

Production Capacity

50000

Key features

High Strength Material: Made from durable Aluminium alloy 6061-T6 for robust performance.
Fast Construction Speed: Achieves 3-5 days per storey with easy installation and dismantling.
No Plastering Required: Smooth surface after removal eliminates the need for plastering costs.
High Load Capacity: Supports 60 KN per square meter with excellent stability and integrity.
Cost Effective Scrap Value: Scrap value is approximately 50% of the new panel price.
Certified Quality: Products are ISO and CE certified for safety and reliability.
Warranty Coverage: Comes with a 1-year warranty for peace of mind.
Available After-Sales: Professional after-sales service is available for support.

Company profile

Business Type: Manufacturer/Factory, Group CorporationAverage Response Time: ≤7.41h

About Our Factory & Business Background

AddressLu Jia Cun Industrial Park, Qingdao, Shandong, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: 1-3 months

Our Production Capability & Technical Expertise

Main ProductsConcrete Batching Plant, Concrete Pipe Making Machine, Dry Mortar Mix Plant, Concrete Twin Shaft Mixer, Asphalt Mixing Plant, Asphalt Mixer, Self Loading Concrete Mixer, Pumps

Our Industry Experience & Global Business Record

Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe

Product Q&A

Q:What material is the formwork made of?
A:
The formwork is made from high-quality Aluminium alloy 6061-T6.
Q:How long does it take to construct one storey?
A:
The construction period is typically 3-5 days per storey.
Q:Is plastering required after removing the formwork?
A:
No, the smooth surface effect eliminates the need for plastering.
Q:What is the load capacity of the formwork?
A:
The load capacity is 60 KN per square meter, ensuring stability.
Q:Does installation require a crane?
A:
No, it does not require a crane for shifting and assembly.

Send Inquiry

*To:SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Easy High Quality 6061-T6 Aluminum Slab Column Formwork

Easy High Quality 6061-T6 Aluminum Slab Column Formwork

US$120.00-125.00
500 Square Meters(MOQ)
Made-in-China.com