Powered by Made-in-China.com
Casting Wall Stair Slab Column Robust Aluminum Formwork with 6061-T6
US$50.00-100.001 Square Meter
Casting Wall Stair Slab Column Robust Aluminum Formwork with 6061-T6
US$50.00-100.00
1 Square Meter
Product profile
Customization
AvailableAfter-sales Service
AvailableWarranty
1 YearsModel NO.
6061-T6Certification
ISO, CEMaterial
SteelType
Wall FormworkTransport Package
StandardTrademark
MACPEXOrigin
ChinaHS Code
8480411000Production Capacity
50000Key features
High Strength Material: Made from durable Aluminium alloy 6061-T6 for robust performance.
Fast Construction Speed: Achieves 3-5 days per storey with easy installation and dismantling.
No Plastering Required: Smooth surface after removal eliminates the need for plastering costs.
High Load Capacity: Supports 60 KN per square meter with excellent stability and integrity.
Cost Effective Scrap Value: Scrap value is approximately 50% of the new panel price.
Certified Quality: Products are ISO and CE certified for safety and reliability.
Warranty Coverage: Comes with a 1-year warranty for peace of mind.
Available After-Sales: Professional after-sales service is available for support.
Company profile

Business Type: Manufacturer/Factory, Group CorporationAverage Response Time: ≤6.47h
About Our Factory & Business Background
AddressLu Jia Cun Industrial Park, Qingdao, Shandong, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: 1-3 months
Our Production Capability & Technical Expertise
Main ProductsConcrete Batching Plant, Concrete Pipe Making Machine, Dry Mortar Mix Plant, Concrete Twin Shaft Mixer, Asphalt Mixing Plant, Asphalt Mixer, Self Loading Concrete Mixer, Pumps
Our Industry Experience & Global Business Record
Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe
Product Q&A
Q:What material is the formwork made of?
A:
The formwork is made from high-quality Aluminium alloy 6061-T6.
Q:How long does it take to construct one storey?
A:
The construction period is typically 3-5 days per storey.
Q:Is plastering required after removing the formwork?
A:
No, the smooth surface effect eliminates the need for plastering.
Q:What is the load capacity of the formwork?
A:
The load capacity is 60 KN per square meter, ensuring stability.
Q:Does installation require a crane?
A:
No, it does not require a crane for shifting and assembly.
Send Inquiry
*To:
SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.
SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.*Content:
0/4000
Supplier replies will be sent to your registered email
You may also like
Lianggong Steel Aluminum Wall Slab Column H20 Timber Beam Tunnel Formwork for Construction with High Speed
US$130.00-165.00
50 Square Meters(MOQ)
High Quality Aluminium Formwork Wall Slab Column Formwork System and Shuttering Concrete Modular Panels with OEM & ODM Service
US$120.00-130.00
1,000 Square Meters(MOQ)
Robust Deck Formwork with 6061-T6 Aluminum Alloy Plywood Construction
US$1.00-9,999.00
1 Piece(MOQ)
Construction Materials Wall Slab Aluminum & Steel Frame Formwork for Concrete with Plywood
US$22.66-44.99
100 pieces(MOQ)
6061-T6 Aluminum Formwork with 5-Day Construction Period Hot Sale
US$50.00-100.00
1 Square Meter(MOQ)
Easy Fast Construction Rapid Forming Slab Column Beam Floor Support Wall Formwork on Site Casting
US$20.00-40.00
100 Pieces(MOQ)
High Quality Aluminium Steel Wall Slab Column with Concrete Formwork Shuttering Pillar Mould
US$90.00-180.00
30 Square Meters(MOQ)
Reusable Adjustable Steel Frame Formwork for Slab Wall and Column Formwork
US$99.00-180.00
1,000 Meters(MOQ)
Aluminium Steel Formwork Wall Slab Column Formwork and Shuttering Concrete Molding with OEM & ODM Service
US$90.00-180.00
30 Square Meters(MOQ)
China Supplier Durable Steel Frame Formwork for Column and Wall Construction with Steel Frame Panel Lined with Plywood
US$98.87-100.87
100 Meters(MOQ)
Factory Direct Concrete Mold Wall & Column Aluminum& Steel Frame Formwork for Concrete Construction with Plywood
US$22.66-44.99
100 pieces(MOQ)
Fast Casting Wall Stair Slab Column Robust Aluminum Formwork with 6061-T6
US$50.00-100.00
1 Square Meter(MOQ)
Aluminium Steel Formwork Wall Slab Column Formwork and Shuttering Concrete Construction with OEM & ODM Service
US$90.00-180.00
30 Square Meters(MOQ)
Aluminum Formwork with 60610-T6 for Wall Slab Panel
US$50.00-100.00
1 Square Meter(MOQ)
Aluminium Steel Formwork Wall Slab Column Concrete Formwork Shuttering Mold with OEM & ODM Service
US$90.00-180.00
30 Square Meters(MOQ)
Easy High Quality with High Grade Concrete 6061-T6 Aluminum Formwork Slab Formwork Column Formwork
US$125.00
1,000 Square Meters(MOQ)
Slab Pouring China Construction Aluminium Wall Column Formwork Table Form with Low Price
US$55.00-101.00
500 Square Meters(MOQ)
Concrete Casting Modular Aluminium Formwork & Steel Formwork with Custom Sample Service
US$28.00-100.00
1 Piece(MOQ)



















