SourcingAI
Try for free
Powered by Made-in-China.com
Concrete Wall Stair Slab Column Aluminum Formwork by 6061-T6 Hot Sale
US$50.00-100.00
1 Square Meter

Product profile

Customization

Available

After-sales Service

Available

Warranty

1 Years

Model NO.

Panel

Certification

ISO, CE

Material

Steel

Type

Wall Formwork

Transport Package

Standard

Trademark

MACPEX

Origin

China

HS Code

8480411000

Production Capacity

50000

Key features

High-Strength Material: Made from premium 6061-T6 aluminum alloy for superior durability and load capacity.
Fast Construction Speed: Achieves 3-5 days per storey with easy installation and dismantling after brief training.
No Plastering Required: Smooth surface finish eliminates the need for plastering, saving significant labor costs.
High Load Capacity: Supports 60 KN per square meter, ensuring stability and preventing formwork shifting.
Cost-Effective Scrap Value: Scrap value is approximately 50% of the new panel price, offering high residual value.
Crane Efficiency: Does not require a crane for assembly, allowing the crane to be used for other tasks.
Quality Assurance: Firm structure prevents bursting, reducing cleaning costs and preventing concrete waste.
Global Certification: Certified with ISO and CE standards, ensuring compliance with international quality norms.

Company profile

SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.
High Repeat Buyers ChoiceFast DeliveryProduct CertificationFlexible Customization
Business Type: Manufacturer/Factory, Group CorporationAverage Response Time: ≤3.27h

About Our Factory & Business Background

AddressLu Jia Cun Industrial Park, Qingdao, Shandong, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: 1-3 months

Our Production Capability & Technical Expertise

Main ProductsConcrete Batching Plant, Concrete Pipe Making Machine, Dry Mortar Mix Plant, Concrete Twin Shaft Mixer, Asphalt Mixing Plant, Asphalt Mixer, Self Loading Concrete Mixer, Pumps

Our Industry Experience & Global Business Record

Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe

Product Q&A

Q:What is the material of the formwork?
A:
The formwork is made from high-quality aluminum alloy 6061-T6.
Q:How long does it take to construct one storey?
A:
The construction period is typically 3-5 days per storey.
Q:Is plastering required after removing the formwork?
A:
No, the smooth effect after removing the formwork means there is no need for plastering.
Q:What is the load capacity of the formwork?
A:
The load capacity is 60 KN per square meter, ensuring good integrality and uniform load.
Q:What is the warranty period for the product?
A:
We provide a 1-year warranty for the formwork.

Send Inquiry

*To:SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like