SourcingAI
Try for free
Powered by Made-in-China.com
Durable Aluminum Formwork for Concrete Construction
US$50.00-100.00
1 Square Meter

Product profile

Customization

Available

After-sales Service

Available

Warranty

1 Years

Model NO.

MP

Certification

ISO, CE

Material

Steel

Type

Wall Formwork

Code

6061-T6

Construction Period

5 Days

Load Capacity

60kn

After Sale Service

Available

Transport Package

Standard

Trademark

MACPEX

Origin

China

HS Code

8480411000

Production Capacity

50000

Key features

Lightweight & Strong Material: Made from durable Aluminum alloy 6061-T6 for strength and ease of handling.
No Plastering Required: Smooth finish after removal eliminates the need for additional plastering costs.
High Load Capacity: Supports 60 KN per square meter ensuring stability and uniform load distribution.
Rapid Construction Speed: Construction period is 3-5 days per storey for efficient project completion.
No Crane Assistance Needed: Does not require a crane for shifting and assembly, optimizing equipment usage.
High Scrap Value: Scrap value is approximately 50% of the new panel cost.
Easy Installation: Workers can easily learn to install and dismantle after a short training period.
ISO & CE Certified: Product meets international quality standards with ISO and CE certifications.

Company profile

SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.
High Repeat Buyers ChoiceFast DeliveryProduct CertificationFlexible Customization
Business Type: Manufacturer/Factory, Group CorporationAverage Response Time: ≤3.77h

About Our Factory & Business Background

AddressLu Jia Cun Industrial Park, Qingdao, Shandong, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: 1-3 months

Our Production Capability & Technical Expertise

Main ProductsConcrete Batching Plant, Concrete Pipe Making Machine, Dry Mortar Mix Plant, Concrete Twin Shaft Mixer, Asphalt Mixing Plant, Asphalt Mixer, Self Loading Concrete Mixer, Pumps

Our Industry Experience & Global Business Record

Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe

Product Q&A

Q:What is the material of the formwork?
A:
The formwork is made from Aluminum alloy 6061-T6, which is lightweight yet strong.
Q:How long does it take to construct one storey?
A:
The construction period is typically 3 to 5 days per storey.
Q:Is a crane required for installation?
A:
No, the system does not require a crane for shifting and assembly.
Q:Do I need to plaster the walls after removing the formwork?
A:
No, the smooth finish eliminates the need for plastering.
Q:What is the load capacity of the formwork?
A:
The load capacity is 60 KN per square meter.

Send Inquiry

*To:SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Durable Aluminum Frame Formwork for Tailored Construction Solutions
Made-in-China.com
Durable Aluminum Formwork for Rapid Wall Construction Projects
Made-in-China.com
Durable Concrete Formwork Systems for Efficient Construction Tasks
Made-in-China.com