SourcingAI
Try for free
Powered by Made-in-China.com
Durable Aluminum Formwork for Concrete Construction Hot Sale
US$50.00-100.00
1 Square Meter

Product profile

Customization

Available

After-sales Service

Available

Warranty

1 Years

Model NO.

MP

Certification

ISO, CE

Material

Steel

Type

Wall Formwork

Code

6061-T6

Construction Period

5 Days

Load Capacity

60kn

After Sale Service

Available

Transport Package

Standard

Trademark

MACPEX

Origin

China

HS Code

8480411000

Production Capacity

50000

Key features

High Load Capacity: Supports 60 KN per square meter for uniform load and stability.
Fast Construction Speed: Reduces construction period to 3-5 days per storey.
No Plastering Required: Smooth finish eliminates the need for additional plastering costs.
Easy Installation: Workers can install and dismantle easily after short training.
High Scrap Value: Scrap value is approximately 50% of the new panel price.
No Crane Needed: Does not require crane for shifting, optimizing crane usage.
Durable Material: Made from Aluminium alloy 6061-T6 for firmness and durability.
Versatile Application: Suitable for monolithic casting, slab, beam, wall, and staircase.

Company profile

SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.
High Repeat Buyers ChoiceFast DeliveryProduct CertificationFlexible Customization
Business Type: Manufacturer/Factory, Group CorporationAverage Response Time: ≤3.82h

About Our Factory & Business Background

AddressLu Jia Cun Industrial Park, Qingdao, Shandong, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: 1-3 months

Our Production Capability & Technical Expertise

Main ProductsConcrete Batching Plant, Concrete Pipe Making Machine, Dry Mortar Mix Plant, Concrete Twin Shaft Mixer, Asphalt Mixing Plant, Asphalt Mixer, Self Loading Concrete Mixer, Pumps

Our Industry Experience & Global Business Record

Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe

Product Q&A

Q:What is the material of the formwork?
A:
The formwork is made from Aluminium alloy 6061-T6.
Q:How long does the construction take?
A:
The construction period is 3-5 days per storey.
Q:Is plastering required after removing the formwork?
A:
No, the smooth effect after removing the formwork means there is no need to plaster.
Q:What is the load capacity of the formwork?
A:
The load capacity is 60 KN per square meter.
Q:Do I need a crane for installation?
A:
No, the system does not require a crane for shifting and assembly.

Send Inquiry

*To:SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Durable Aluminum Frame Formwork for Tailored Construction Solutions
Made-in-China.com
Custom 117 Aluminum Frame Formwork for Durable Concrete Solutions
Made-in-China.com