SourcingAI
Try for free
Powered by Made-in-China.com
Flying Table Slab Formwork with H20 for Deck Concrete Work
US$50.00-100.00
1 Square Meter

Product profile

Customization

Available

After-sales Service

Available

Warranty

1 Years

Model NO.

FT

Certification

ISO, CE

Material

Steel

Type

Slab Formwork

Transport Package

Standard

Trademark

MACPEX

Origin

China

HS Code

8480411000

Production Capacity

50000

Key features

Fast Forming Operations: Systematic assembly sequence enables fast forming with fewer slab props.
Ergonomic and Lightweight: Low weight panels and compact dimensions facilitate non-tiring work.
Early Striking Capability: Drophead system allows early striking, reducing on-site material needs.
Easy Cleaning Design: Powder-coated elements and plastic components ensure easy cleaning.
ISO and CE Certified: Product meets international safety and quality standards with ISO and CE.

Company profile

SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.
High Repeat Buyers ChoiceFast DeliveryProduct CertificationFlexible Customization
Business Type: Manufacturer/Factory, Group CorporationAverage Response Time: ≤4.66h

About Our Factory & Business Background

AddressLu Jia Cun Industrial Park, Qingdao, Shandong, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: 1-3 months

Our Production Capability & Technical Expertise

Main ProductsConcrete Batching Plant, Concrete Pipe Making Machine, Dry Mortar Mix Plant, Concrete Twin Shaft Mixer, Asphalt Mixing Plant, Asphalt Mixer, Self Loading Concrete Mixer, Pumps

Our Industry Experience & Global Business Record

Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe

Product Q&A

Q:What is the warranty period for this formwork?
A:
The product comes with a 1-year warranty.
Q:What certifications does the slab formwork have?
A:
It is certified with ISO and CE standards.
Q:What material is used for the formwork?
A:
The formwork is made of steel.
Q:What is the lead time for shipping?
A:
The lead time is one month during the peak season and 1-3 months during the off-season.
Q:Is after-sales service available?
A:
Yes, after-sales service is available.

Send Inquiry

*To:SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Tecon Aluflex Slab Formwork for Concrete

Tecon Aluflex Slab Formwork for Concrete

US$100.00-160.00
300 Square Meters(MOQ)
Made-in-China.com