SourcingAI
Try for free
Powered by Made-in-China.com
High Quality Panel Aluminum Formwork for High Rise Buildings
US$50.00-100.00
1 Square Meter

Product profile

Customization

Available

After-sales Service

Available

Warranty

1 Years

Model NO.

MP

Certification

ISO, CE

Material

Steel

Type

Wall Formwork

Code

6061-T6

Construction Period

5 Days

Load Capacity

60kn

After Sale Service

Available

Transport Package

Standard

Trademark

MACPEX

Origin

China

HS Code

8480411000

Production Capacity

50000

Key features

High Load Capacity: Supports 60 KN per square meter for excellent stability and uniform load distribution.
Fast Construction Speed: Requires only 3-5 days per storey with easy installation and dismantling after brief training.
No Plastering Needed: Smooth surface finish eliminates the need for plastering, saving significant cleaning and labor costs.
Crane-Free Assembly: Does not require crane assistance for shifting and assembly, optimizing crane usage for other tasks.
High Scrap Value: Scrap value is approximately 50% of the new panel cost, offering significant residual value.
Durable Aluminum Alloy: Made from 6061-T6 aluminum alloy, ensuring firm structure that prevents bursting and concrete waste.
Versatile Application: Perfect for constructing walls, stairs, columns, slabs, and other high-rise building components.
Certified Quality: Products are ISO and CE certified, ensuring compliance with international quality standards.

Company profile

SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.
High Repeat Buyers ChoiceFast DeliveryProduct CertificationFlexible Customization
Business Type: Manufacturer/Factory, Group CorporationAverage Response Time: ≤3.72h

About Our Factory & Business Background

AddressLu Jia Cun Industrial Park, Qingdao, Shandong, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: 1-3 months

Our Production Capability & Technical Expertise

Main ProductsConcrete Batching Plant, Concrete Pipe Making Machine, Dry Mortar Mix Plant, Concrete Twin Shaft Mixer, Asphalt Mixing Plant, Asphalt Mixer, Self Loading Concrete Mixer, Pumps

Our Industry Experience & Global Business Record

Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe

Product Q&A

Q:What is the material of the formwork?
A:
The formwork is made from high-quality aluminum alloy 6061-T6.
Q:How long does the construction period take?
A:
The construction period is 3-5 days per storey.
Q:Is crane assistance required for installation?
A:
No, the system does not require crane assistance for shifting and assembly.
Q:What is the load capacity of the formwork?
A:
The load capacity is 60 KN per square meter.
Q:Do I need to plaster the walls after removing the formwork?
A:
No, the smooth effect after removing the formwork means there is no need for plastering.

Send Inquiry

*To:SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like