Powered by Made-in-China.com

High Rise Building Aluminum Formwork at Competitive Prices
US$50.00-100.00
1 Square Meter
Product profile
Customization
AvailableAfter-sales Service
AvailableWarranty
1 YearsModel NO.
MPCertification
ISO, CEMaterial
SteelType
Wall FormworkCode
6061-T6Construction Period
5 DaysLoad Capacity
60knAfter Sale Service
AvailableTransport Package
StandardTrademark
MACPEXOrigin
ChinaHS Code
8480411000Production Capacity
50000Key features
Fast Construction Speed: Construction period is only 3-5 days per storey, significantly accelerating project timelines.
No Plastering Required: Smooth surface after removal eliminates the need for plastering, saving cleaning and labor costs.
High Load Capacity: Supports 60 KN per square meter, ensuring stability and preventing formwork shifting.
Cost-Effective Scrap Value: Scrap value is approximately 50% of the new panel price, offering high residual value.
Easy Installation: Workers can easily learn to install and dismantle after a short training period.
Crane Efficiency: Does not require crane for shifting and assembly, allowing crane to be used for other activities.
Certified Quality: Products are certified with ISO and CE standards for reliable performance.
Durable Material: Made from high-strength Aluminium alloy 6061-T6, firm enough to prevent bursting.
Company profile
Business Type: Manufacturer/Factory, Group CorporationAverage Response Time: ≤3.91h
About Our Factory & Business Background
AddressLu Jia Cun Industrial Park, Qingdao, Shandong, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: 1-3 months
Our Production Capability & Technical Expertise
Main ProductsConcrete Batching Plant, Concrete Pipe Making Machine, Dry Mortar Mix Plant, Concrete Twin Shaft Mixer, Asphalt Mixing Plant, Asphalt Mixer, Self Loading Concrete Mixer, Pumps
Our Industry Experience & Global Business Record
Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe
Product Q&A
Q:What is the construction period for this formwork?
A:
The construction period is 3-5 days per storey.
Q:Is plastering required after removing the formwork?
A:
No, the smooth effect after removing the formwork means there is no need to plaster.
Q:What is the load capacity of the aluminum formwork?
A:
The load capacity is 60 KN per square meter.
Q:Does the installation require a crane?
A:
No, it does not require a crane for shifting and assembly.
Q:What is the scrap value of the formwork?
A:
The scrap value is about 50% of the new panel.
Send Inquiry
*To:
SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.
SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.*Content:
Supplier replies will be sent to your registered email
You may also like
High Strength Modular Construction Concrete Formwork System for High Rise Buildings Aluminum Formwork
US$38.00-160.00
50 Square Meters(MOQ)
Zulin Construction Steel Formwork Price Flat Form for High-Rise Building
US$3,000.00-10,000.00
10 Sets(MOQ)
Climbing Construction Steel Formwork Price Flat Form for High-Rise Building
US$3,000.00-10,000.00
10 Sets(MOQ)
High Precision Modular Concrete Forming System for High Rise Building Construction Aluminum Formworks
US$38.00-160.00
50 Square Meters(MOQ)
Customized Climbing Zulin Steel Construction Price Formwork for Sale Flat Form High-Rise Building
US$3,000.00-10,000.00
10 Sets(MOQ)
Formwork Aluminium for High-Rise Building
US$750.00-800.00
400 Square Meters(MOQ)
Climbing Formwork Zulin Construction Steel Price Building Material Flat Form for High-Rise Factory
US$3,000.00-10,000.00
10 Sets(MOQ)
Easy Lightweight Corrosion Resistant 6061-T6 Aluminum Scaffold Material Construction Concrete High-Rise Building Formwork
US$120.00-125.00
500 Square Meters(MOQ)
Construction Aluminum Frame Formwork Concrete Wall Formwork System with Competitive Price
US$38.00-160.00
50 Square Meters(MOQ)
High-Strength Aluminum Building Formwork for Fast Construction Projects
US$40.00
100 Square Meters(MOQ)
Galvanized Steel Waler Beam Formwork Systems Used for High-Rise Buildings
US$168.00-459.00
1 Piece(MOQ)
Concrete Form Steel Metalcantilever Climbing Wall Jump Formwork for High-Rise Building Construction
US$220.00-380.00
200 Square Meters(MOQ)
Concrete Form Cantilever Climbing Jump Formwork for Concrete High-Rise Building Construction
US$220.00-380.00
200 Square Meters(MOQ)
Integrated Welded Steel Template for High-Rise Building Formwork System
US$16.50-38.20
50 Pieces(MOQ)
Durable Concrete Formwork Systems for High-Rise Building Applications
US$52.00
10 Square Meters(MOQ)
Cast-in-Place Concrete Mould Suspension Cantilever Climbing Jump Formwork for High-Rise Building Construction
US$220.00-380.00
200 Square Meters(MOQ)
Cantilever Climbing Shuttering Formwork System for High-Rise Building Concrete Construction
US$220.00-380.00
200 Square Meters(MOQ)
High-Strength Steel Formwork for Concrete Columns in High-Rise Building Projects
US$5.00-10.00
200 Pieces(MOQ)
High Rise Building Formwork at Competitive Rates
US$50.00-100.00
1 Square Meter(MOQ)



















