SourcingAI
Try for free
Powered by Made-in-China.com
High Rise Building Formwork with Competitive Pricing
US$50.00-100.00
1 Square Meter

Product profile

Customization

Available

After-sales Service

Available

Warranty

1 Years

Model NO.

MP

Certification

ISO, CE

Material

Steel

Type

Wall Formwork

Code

6061-T6

Construction Period

5 Days

Load Capacity

60kn

After Sale Service

Available

Transport Package

Standard

Trademark

MACPEX

Origin

China

HS Code

8480411000

Production Capacity

50000

Key features

Fast Construction Speed: Construction period is only 3-5 days per storey, significantly accelerating project timelines.
No Plastering Required: Smooth surface after removal eliminates the need for plastering, saving cleaning and material costs.
High Load Capacity: Supports 60 KN per square meter, ensuring stability and uniform load distribution during casting.
Crane-Free Assembly: Does not require crane assistance for shifting and assembly, optimizing crane usage for other tasks.
High Scrap Value: Scrap value is approximately 50% of the new panel price, offering significant residual value.
Durable Aluminum Material: Made from 6061-T6 aluminum alloy, firm enough to prevent bursting and concrete waste.
Easy Installation: Workers can easily learn to install and dismantle the formwork after a short training period.
Versatile Application: Suitable for monolithic casting, wall, stair, column, and slab construction in high-rise buildings.

Company profile

Business Type: Manufacturer/Factory, Group CorporationAverage Response Time: ≤6.64h

About Our Factory & Business Background

AddressLu Jia Cun Industrial Park, Qingdao, Shandong, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: 1-3 months

Our Production Capability & Technical Expertise

Main ProductsConcrete Batching Plant, Concrete Pipe Making Machine, Dry Mortar Mix Plant, Concrete Twin Shaft Mixer, Asphalt Mixing Plant, Asphalt Mixer, Self Loading Concrete Mixer, Pumps

Our Industry Experience & Global Business Record

Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe

Product Q&A

Q:What is the construction period for this formwork?
A:
The construction period is 3-5 days per storey.
Q:Does the formwork require a crane for installation?
A:
No, it does not require a crane for shifting and assembly, allowing the crane to be used for other activities.
Q:Is plastering needed after removing the formwork?
A:
No, the smooth effect after removing the formwork means there is no need to plaster.
Q:What is the load capacity of the aluminum formwork?
A:
The load capacity is 60 KN per square meter.
Q:What is the scrap value of the formwork panels?
A:
The scrap value is about 50% of the new panel.

Send Inquiry

*To:SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

High Rise Building Panels Formwork with Modular Sizes

High Rise Building Panels Formwork with Modular Sizes

US$125.00-210.00
1,000 Square Meters(MOQ)
Made-in-China.com
High Rise Building Formwork with Affordable Prices

High Rise Building Formwork with Affordable Prices

US$50.00-100.00
1 Square Meter(MOQ)
Made-in-China.com