SourcingAI
Try for free
Powered by Made-in-China.com
Lightweight Aluminum Formwork for High Rise Buildings
US$50.00-100.00
1 Square Meter

Product profile

Customization

Available

After-sales Service

Available

Warranty

1 Years

Model NO.

MP

Certification

ISO, CE

Material

Steel

Type

Wall Formwork

Code

6061-T6

Construction Period

5 Days

Load Capacity

60kn

After Sale Service

Available

Transport Package

Standard

Trademark

MACPEX

Origin

China

HS Code

8480411000

Production Capacity

50000

Key features

Rapid Construction Period: 3-5 days per storey construction cycle.
No Plastering Required: Smooth surface after removal eliminates plastering costs.
High Load Capacity: Supports 60 KN per square meter for uniform load distribution.
Crane-Free Assembly: Does not require crane for shifting and assembly.
High Scrap Value: Scrap value is approximately 50% of the new panel.
Durable Material: Made from firm Aluminium alloy 6061-T6.
Easy Installation: Workers can learn to install and dismantle after short training.
ISO and CE Certified: Product meets international ISO and CE certification standards.

Company profile

SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.
High Repeat Buyers ChoiceFast DeliveryProduct CertificationFlexible Customization
Business Type: Manufacturer/Factory, Group CorporationAverage Response Time: ≤3.43h

AI-Powered supplier vetting

SummarySHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD. is a Chinese company based in Shandong, specializing in manufacturing concrete-related products. The company emphasizes high-quality products and excellent service. While it offers customization and ODM services, it lacks recent innovations and does not provide OEM services for well-known brands. Financial data from last year indicates no revenue or profit, potentially affecting its credibility. The supplier does not participate in overseas trade shows or have overseas showrooms. It lacks formal corrective actions for service capability but maintains quality assurance processes.
Supplier typeThe supplier is identified as both a Trading Company and Manufacturer/Factory, with a group corporation structure.
Financial creditThe supplier reported no revenue or profit for the last year, which may indicate financial instability or challenges.
R&D capabilityThe supplier has not introduced new products in the past year and does not have an SDK available, indicating limited innovation capability.
Production capacityThe company offers a wide range of concrete-related products and is based in an industrial park, suggesting adequate production capability.
Customization capabilityOffers various levels of customization, including full customization and ODM services, demonstrating strong customization capability.

Product Q&A

Q:What is the construction period per storey?
A:
The construction period is 3-5 days per storey.
Q:Does this formwork require a crane for assembly?
A:
No, it does not require a crane for shifting and assembly.
Q:Is plastering needed after removing the formwork?
A:
No, the smooth effect after removal means there is no need to plaster.
Q:What is the load capacity of the formwork?
A:
The load capacity is 60 KN per square meter.
Q:What is the scrap value of the panels?
A:
The scrap value is about 50% of the new panel.

Send Inquiry

*To:SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Formwork Aluminium for High-Rise Building

Formwork Aluminium for High-Rise Building

US$750.00-800.00
400 Square Meters(MOQ)
Made-in-China.com
Lightweight Aluminum Formwork for High Rise Buildings Hot Sale
Made-in-China.com