SourcingAI
Try for free
Powered by Made-in-China.com
Monolithic Wall Stair Slab Column Robust Aluminum Formwork by 6061-T6
US$50.00-100.00
1 Square Meter

Product profile

Customization

Available

After-sales Service

Available

Warranty

1 Years

Certification

ISO, CE

Material

Steel

Type

Wall Formwork

Transport Package

Standard

Trademark

MACPEX

Origin

China

HS Code

8480411000

Production Capacity

50000

Key features

High Strength Material: Constructed from durable 6061-T6 aluminum alloy for superior performance.
Fast Construction Speed: Achieves 3-5 days per storey with easy installation after short training.
No Plastering Required: Smooth surface finish eliminates the need for additional plastering costs.
High Load Capacity: Supports 60 KN per square meter ensuring stability and uniform load.
Cost Effective Scrap Value: Scrap value is approximately 50% of the new panel price.
Crane Efficiency: No crane required for assembly, allowing crane use for other tasks.
Certified Quality: Meets ISO and CE certification standards for safety and quality.
One Year Warranty: Comprehensive one-year warranty coverage included with purchase.

Company profile

SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.
High Repeat Buyers ChoiceFast DeliveryProduct CertificationFlexible Customization
Business Type: Manufacturer/Factory, Group CorporationAverage Response Time: ≤3.67h

About Our Factory & Business Background

AddressLu Jia Cun Industrial Park, Qingdao, Shandong, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: 1-3 months

Our Production Capability & Technical Expertise

Main ProductsConcrete Batching Plant, Concrete Pipe Making Machine, Dry Mortar Mix Plant, Concrete Twin Shaft Mixer, Asphalt Mixing Plant, Asphalt Mixer, Self Loading Concrete Mixer, Pumps

Our Industry Experience & Global Business Record

Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe

Product Q&A

Q:What material is used for the formwork?
A:
The formwork is made from high-quality aluminum alloy 6061-T6.
Q:How long does it take to install one storey?
A:
Construction typically takes 3-5 days per storey after workers receive short training.
Q:Is a crane required for installation?
A:
No, the system does not require a crane for shifting and assembly, allowing the crane to be used for other activities.
Q:Do I need to plaster the walls after removing the formwork?
A:
No, the smooth effect after removing the formwork means there is no need for plastering.
Q:What is the load capacity of the formwork?
A:
The load capacity is 60 KN per square meter, ensuring good integrality and uniform load.

Send Inquiry

*To:SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Easy High Quality 6061-T6 Aluminum Slab Column Formwork

Easy High Quality 6061-T6 Aluminum Slab Column Formwork

US$120.00-125.00
500 Square Meters(MOQ)
Made-in-China.com