Powered by Made-in-China.com

Panel Formwork for Quick High Rise Building Construction
US$50.00-100.00
1 Square Meter
Product profile
Customization
AvailableAfter-sales Service
AvailableWarranty
1 YearsModel NO.
MPCertification
ISO, CEMaterial
SteelType
Wall FormworkCode
6061-T6Construction Period
5 DaysLoad Capacity
60knAfter Sale Service
AvailableTransport Package
StandardTrademark
MACPEXOrigin
ChinaHS Code
8480411000Production Capacity
50000Key features
Rapid Construction Cycle: Construction period of 3-5 days per storey for high-rise buildings.
No Plastering Required: Smooth finish after removal eliminates the need for additional plastering.
Crane-Free Assembly: Does not require crane assistance for shifting and assembly, saving time.
High Load Capacity: Supports 60 KN per square meter ensuring stability and uniform load.
Durable Aluminum Material: Made from 6061-T6 aluminum alloy, firm enough to prevent bursting.
Cost-Effective Scrap Value: Scrap value is approximately 50% of the new panel cost.
Easy Installation: Workers can learn to install and dismantle after a short training period.
ISO and CE Certified: Product meets international quality and safety standards.
Company profile
Business Type: Manufacturer/Factory, Group CorporationAverage Response Time: ≤4.91h
About Our Factory & Business Background
AddressLu Jia Cun Industrial Park, Qingdao, Shandong, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: 1-3 months
Our Production Capability & Technical Expertise
Main ProductsConcrete Batching Plant, Concrete Pipe Making Machine, Dry Mortar Mix Plant, Concrete Twin Shaft Mixer, Asphalt Mixing Plant, Asphalt Mixer, Self Loading Concrete Mixer, Pumps
Our Industry Experience & Global Business Record
Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe
Product Q&A
Q:What is the construction period per storey?
A:
The construction period is 3-5 days per storey.
Q:Does this formwork require a crane for assembly?
A:
No, it does not require a crane for shifting and assembly.
Q:Is plastering needed after removing the formwork?
A:
No, the smooth effect after removal means no plastering is needed.
Q:What is the load capacity of the formwork?
A:
The load capacity is 60 KN per square meter.
Q:What material is used for the formwork?
A:
The formwork is made of Aluminum alloy 6061-T6.
Send Inquiry
*To:
SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.
SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.*Content:
Supplier replies will be sent to your registered email
You may also like
China Customized Durable Timber Beam Table Formwork for High-Rise Building Slab Construction
US$70.00
200 Square Meters(MOQ)
Lianggong High Strength Steel and Aluminum Frame Formwork for Concrete Wall Column Construction
US$70.00-75.00
100 Square Meters(MOQ)
Lianggong Reusable Heavy Duty Steel Column Wall Slab and Beam Formwork for High-Rise Concrete Construction
US$65.00-75.00
100 Square Meters(MOQ)
Industrial Easy Assemble High Quality Green Slab Formwork for High-Rise Building
US$1.99-199.00
5,000 Pieces(MOQ)
Manufacture Hydraulic Auto Self Climbing Formwork/Concrete Formwork for High Rise Building Projects
US$800.00-900.00
20 Pieces(MOQ)
Lianggong Building Material Concrete Panels Precast Concrete Steel Formwork for Column Pillar Construction
US$1,200.00-1,500.00
10 Tons(MOQ)
High Strength Steel Formwork Panels for Concrete Structural Building Engineering
US$28.00-100.00
1 Piece(MOQ)
Panel Formwork for Efficient High Rise Building Construction
US$50.00-100.00
1 Square Meter(MOQ)
Lianggong High Efficiency Steel Cantilever Climbing Formwork for Concrete Construction
US$399.00-499.00
300 Sets(MOQ)
Quick Install High Strength Steel Formwork for Rural Villa Building, Sample Available
US$28.00-100.00
1 Piece(MOQ)
Hot Sale Aluminum Frame Formwork 6061-T6alloy for High Rise Core Wall Construction
US$58.50-68.50
300 Sets(MOQ)
High Efficiency Drop Head Formwork System for High Rise Building Concrete Floor Construction
US$80.00-150.00
300 Square Meters(MOQ)
High Performance Aluminum Formwork for High Rise Building Concrete Construction Projects
US$5.00-50.00
180 Square Meters(MOQ)
Concrete Mould Suspension Cantilever Climbing Jump Formwork for High-Rise Building Construction
US$220.00-380.00
200 Square Meters(MOQ)
High Efficiency Hydraulic Self-Climbing Formwork for Large High-Rise Building Project
US$2,888.00-2,999.00
1 Set(MOQ)
China Manufacture Concrete Form Climbing Jump Formwork for Concrete Mold High-Rise Building Construction
US$220.00-380.00
200 Square Meters(MOQ)
Factory Direct Plastic Concrete Forms PP ABS Modular Building Formwork Panels for Fast Track Construction Applications
US$9.00-14.00
50 Square Meters(MOQ)
Lightweight Aluminium Formwork System for High-Rise Residential Building, Sample Making Supported
US$28.00-100.00
1 Piece(MOQ)



















