SourcingAI
Try for free
Powered by Made-in-China.com
Panel Formwork for Quick High Rise Building Construction
US$50.00-100.00
1 Square Meter

Product profile

Customization

Available

After-sales Service

Available

Warranty

1 Years

Model NO.

MP

Certification

ISO, CE

Material

Steel

Type

Wall Formwork

Code

6061-T6

Construction Period

5 Days

Load Capacity

60kn

After Sale Service

Available

Transport Package

Standard

Trademark

MACPEX

Origin

China

HS Code

8480411000

Production Capacity

50000

Key features

Rapid Construction Cycle: Construction period of 3-5 days per storey for high-rise buildings.
No Plastering Required: Smooth finish after removal eliminates the need for additional plastering.
Crane-Free Assembly: Does not require crane assistance for shifting and assembly, saving time.
High Load Capacity: Supports 60 KN per square meter ensuring stability and uniform load.
Durable Aluminum Material: Made from 6061-T6 aluminum alloy, firm enough to prevent bursting.
Cost-Effective Scrap Value: Scrap value is approximately 50% of the new panel cost.
Easy Installation: Workers can learn to install and dismantle after a short training period.
ISO and CE Certified: Product meets international quality and safety standards.

Company profile

SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.
High Repeat Buyers ChoiceFast DeliveryProduct CertificationFlexible Customization
Business Type: Manufacturer/Factory, Group CorporationAverage Response Time: ≤4.66h

About Our Factory & Business Background

AddressLu Jia Cun Industrial Park, Qingdao, Shandong, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: 1-3 months

Our Production Capability & Technical Expertise

Main ProductsConcrete Batching Plant, Concrete Pipe Making Machine, Dry Mortar Mix Plant, Concrete Twin Shaft Mixer, Asphalt Mixing Plant, Asphalt Mixer, Self Loading Concrete Mixer, Pumps

Our Industry Experience & Global Business Record

Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe

Product Q&A

Q:What is the construction period per storey?
A:
The construction period is 3-5 days per storey.
Q:Does this formwork require a crane for assembly?
A:
No, it does not require a crane for shifting and assembly.
Q:Is plastering needed after removing the formwork?
A:
No, the smooth effect after removal means no plastering is needed.
Q:What is the load capacity of the formwork?
A:
The load capacity is 60 KN per square meter.
Q:What material is used for the formwork?
A:
The formwork is made of Aluminum alloy 6061-T6.

Send Inquiry

*To:SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

High Quality Panel Formwork for High Rise Buildings

High Quality Panel Formwork for High Rise Buildings

US$50.00-100.00
1 Square Meter(MOQ)
Made-in-China.com