SourcingAI
Try for free
Powered by Made-in-China.com
Stair Formworks for Easy and Safe Construction Hot Sale From Alurex
US$50.00-100.00
1 Square Meter

Product profile

Customization

Available

After-sales Service

Available

Warranty

1 Years

Model NO.

MP

Certification

ISO, CE

Material

Steel

Type

Wall Formwork

Code

6061-T6

Construction Period

5 Days

Load Capacity

60kn

After Sale Service

Available

Transport Package

Standard

Trademark

MACPEX

Origin

China

HS Code

8480411000

Production Capacity

50000

Key features

No Plastering Required: Smooth surface after removal eliminates the need for additional plastering costs.
High Load Capacity: Supports 60 KN per square meter ensuring stability and uniform load distribution.
Easy Installation: Workers can easily learn to install and dismantle after a short training period.
Crane Efficiency: Does not require crane for shifting, allowing crane use for other delayed activities.
High Scrap Value: Scrap value is approximately 50% of the new panel cost.
Fast Construction: Construction period is 3-5 days per storey for efficient progress.
Durable Material: Made of Aluminium alloy 6061-T6, firm enough to prevent bursting.
Certified Quality: Products are ISO and CE certified for safety and reliability.

Company profile

SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.
High Repeat Buyers ChoiceFast DeliveryProduct CertificationFlexible Customization
Business Type: Manufacturer/Factory, Group CorporationAverage Response Time: ≤3.80h

About Our Factory & Business Background

AddressLu Jia Cun Industrial Park, Qingdao, Shandong, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: 1-3 months

Our Production Capability & Technical Expertise

Main ProductsConcrete Batching Plant, Concrete Pipe Making Machine, Dry Mortar Mix Plant, Concrete Twin Shaft Mixer, Asphalt Mixing Plant, Asphalt Mixer, Self Loading Concrete Mixer, Pumps

Our Industry Experience & Global Business Record

Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe

Product Q&A

Q:What is the warranty period for the formwork?
A:
We provide a 1-year warranty for our formwork products.
Q:What material is used for the stair formworks?
A:
The formworks are made from high-quality Aluminium alloy 6061-T6.
Q:How long does it take to construct one storey?
A:
The construction period is typically 3-5 days per storey.
Q:Is crane assistance required for installation?
A:
No, the system does not require a crane for shifting and assembly.
Q:What is the load capacity of the formwork?
A:
The load capacity is 60 KN per square meter.

Send Inquiry

*To:SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Formwork Hot Sale for Construction Geoplast Formwork
Made-in-China.com
Steel Slab Formwork GF Pallet Hot Sale Easy Set up

Steel Slab Formwork GF Pallet Hot Sale Easy Set up

US$100.00-120.00
500 Square Meters(MOQ)
Made-in-China.com
High-Precision Tunnel Formwork for Fast and Safe Construction
Made-in-China.com