SourcingAI
Try for free
Powered by Made-in-China.com
Steel Prop Formwork for Reliable Support Aluminum Forms
US$50.00-100.00
1 Square Meter

Product profile

Customization

Available

After-sales Service

Available

Warranty

1 Years

Model NO.

MP

Certification

ISO, CE

Material

Steel

Type

Wall Formwork

Code

6061-T6

Construction Period

5 Days

Load Capacity

60kn

After Sale Service

Available

Transport Package

Standard

Trademark

MACPEX

Origin

China

HS Code

8480411000

Production Capacity

50000

Key features

Aluminum Alloy Material: Constructed from high-strength 6061-T6 aluminum alloy for durability.
Fast Construction Period: Requires only 3-5 days per storey for installation and dismantling.
High Load Capacity: Supports up to 60 KN per square meter ensuring structural stability.
No Plastering Required: Smooth finish after removal eliminates the need for additional plastering.
Crane-Free Assembly: Does not require crane assistance for shifting and assembly.
Scrap Value Retention: Retains approximately 50% scrap value of the new panel cost.
ISO and CE Certified: Meets international safety and quality standards with ISO and CE certification.
1-Year Warranty: Includes a comprehensive 1-year warranty coverage for peace of mind.

Company profile

SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.
High Repeat Buyers ChoiceFast DeliveryProduct CertificationFlexible Customization
Business Type: Manufacturer/Factory, Group CorporationAverage Response Time: ≤5.05h

About Our Factory & Business Background

AddressLu Jia Cun Industrial Park, Qingdao, Shandong, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: 1-3 months

Our Production Capability & Technical Expertise

Main ProductsConcrete Batching Plant, Concrete Pipe Making Machine, Dry Mortar Mix Plant, Concrete Twin Shaft Mixer, Asphalt Mixing Plant, Asphalt Mixer, Self Loading Concrete Mixer, Pumps

Our Industry Experience & Global Business Record

Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe

Product Q&A

Q:What material is the formwork made of?
A:
The formwork is made of high-strength Aluminum alloy 6061-T6.
Q:How long does construction take per storey?
A:
The construction period is typically 3-5 days per storey.
Q:Does the system require a crane for assembly?
A:
No, the system does not require a crane for shifting and assembly.
Q:Is plastering needed after removing the formwork?
A:
No, the smooth finish eliminates the need for plastering.
Q:What is the load capacity of the formwork?
A:
The load capacity is 60 KN per square meter.

Send Inquiry

*To:SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like