Powered by Made-in-China.com
Steel Table Slab Formwork Used for High Rise Building Construction Works Hot Sale
US$50.00-100.00
1 Square Meter
Product profile
Customization
AvailableAfter-sales Service
AvailableWarranty
1 YearsModel NO.
MP deckCertification
ISO, CEMaterial
SteelType
Slab FormworkColor
YellowType of Forms
TableAfter Sale Service
AvailableSample
AvailableTransport Package
StandardSpecification
H20Trademark
MACPEXOrigin
ChinaHS Code
8480411000Production Capacity
50000Key features
Ergonomic Design: Low weight and compact dimensions facilitate non-tiring working operations.
Fast Forming Operations: Systematic assembly sequence and fast system accessories accelerate work.
Reduced Material Requirements: Early striking with drophead system lowers on-site material needs.
Easy Cleaning: Powder-coated elements and plastic components ensure easy cleaning.
1-Year Warranty: Comes with a standard 1-year warranty coverage.
ISO and CE Certified: Product meets international ISO and CE certification standards.
Steel Material: Constructed from durable steel for high-rise building construction.
Available After-Sales Service: Dedicated after-sales support is available for all customers.
Company profile
Business Type: Manufacturer/Factory, Group CorporationAverage Response Time: ≤4.88h
About Our Factory & Business Background
AddressLu Jia Cun Industrial Park, Qingdao, Shandong, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: 1-3 months
Our Production Capability & Technical Expertise
Main ProductsConcrete Batching Plant, Concrete Pipe Making Machine, Dry Mortar Mix Plant, Concrete Twin Shaft Mixer, Asphalt Mixing Plant, Asphalt Mixer, Self Loading Concrete Mixer, Pumps
Our Industry Experience & Global Business Record
Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe
Product Q&A
Q:What is the warranty period for this formwork?
A:
We provide a 1-year warranty for this steel slab formwork.
Q:Is the product certified?
A:
Yes, the product holds ISO and CE certifications.
Q:What is the lead time for delivery?
A:
The lead time is one month during peak season and 1-3 months during off-season.
Q:Is after-sales service available?
A:
Yes, after-sales service is available for this product.
Q:What material is used for the formwork?
A:
The formwork is made of steel.
Send Inquiry
*To:
SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.
SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.*Content:
Supplier replies will be sent to your registered email
You may also like
Zulin Construction Building Material Flat Form High-Rise Climbing Formwork with High Quality
US$3,000.00-10,000.00
10 Sets(MOQ)
Zulin Slab Formwork China Construction Building Material Table Form with Good Price
US$55.00-101.00
500 Square Meters(MOQ)
Heavy Duty Concrete Easy and Economic Projects Steel Frame Wall Formwork for High Rise Building Construction
US$85.00-130.00
300 Square Meters(MOQ)
Heavy-Duty Hot-DIP Galvanized Steel Formwork for Reliable Concrete Construction Work Projects
US$38.00-160.00
50 Square Meters(MOQ)
Factory Direct Shuttering Heat-Resistant Climbing Formwork for Concrete Mold Dam Bridge High-Rise Building Construction
US$220.00-380.00
200 Square Meters(MOQ)
Integrated Welded Steel Template for High-Rise Building Formwork System
US$16.50-38.20
50 Pieces(MOQ)
China Customized Durable Timber Beam Table Formwork for High-Rise Building Slab Construction
US$70.00
200 Square Meters(MOQ)
Concrete Molding Metal Shuttering Climbing Formwork Shear Wall Formwork for High Rise Building Construction
US$220.00-380.00
200 Square Meters(MOQ)
Aluminum/Steel Formwork with Bamboo Plywood Used for Concrete Pouring of Building Construction
US$100.00
500 Pieces(MOQ)
Early Stripping Steel Frame Modular Table Formwork for High Rise Building
US$80.00-150.00
300 Square Meters(MOQ)
High-Strength Alloy Steel Formwork Reusable Concrete Molds for Wall Tall Building Construction
US$24.99-48.99
1 pieces(MOQ)
Factory Direct Steel Formwork Concrete Construction for Slab/Beam Mold Application Building Material
US$105.00-140.00
100 Square Meters(MOQ)
Customized Concrete Form Suspension Cantilever Climbing Jump Formwork for Concrete High-Rise Building Construction
US$220.00-380.00
200 Square Meters(MOQ)
Climbing Construction Steel Formwork Price Flat Form for High-Rise Building
US$3,000.00-10,000.00
10 Sets(MOQ)
Slab Pouring Simple Structure Platform High Rise Building Table Formwork with Good Service
US$55.00-101.00
500 Square Meters(MOQ)
Lianggong High Strength H20 Timber Beam Steel Aluminum Plastic Wall Column Slab Formwork for Concrete Construction
US$90.00-100.00
200 Square Meters(MOQ)
Lianggong Customizable Concrete Column Wall Slab Adjustable Steel Formwork for Building Tunnel Culvert Construction
US$388.00-588.00
30 Pieces(MOQ)



















