SourcingAI
Try for free
Powered by Made-in-China.com
Wall Formwork for Efficient High Rise Building Construction Works
US$50.00-100.00
1 Square Meter

Product profile

Customization

Available

After-sales Service

Available

Warranty

1 Years

Model NO.

MP

Certification

ISO, CE

Material

Steel

Type

Wall Formwork

Code

6061-T6

Construction Period

5 Days

Load Capacity

60kn

After Sale Service

Available

Transport Package

Standard

Trademark

MACPEX

Origin

China

HS Code

8480411000

Production Capacity

50000

Key features

Rapid Construction Speed: Construction period is 3-5 days per storey, significantly accelerating high-rise building progress.
No Plastering Required: Smooth surface after removal eliminates the need for plastering, saving labor and material costs.
High Load Capacity: Supports 60 KN per square meter, ensuring structural stability and uniform load distribution.
Crane-Free Assembly: Does not require crane assistance for shifting and assembly, optimizing crane usage for other tasks.
High Scrap Value: Scrap value is approximately 50% of the new panel price, offering significant residual value.
Durable Material: Made from Aluminium alloy 6061-T6, ensuring firmness and preventing bursting during use.
Easy Installation: Workers can easily learn to install and dismantle the formwork after a short training period.
Certified Quality: Products are certified with ISO and CE standards, ensuring compliance and safety.

Company profile

Business Type: Manufacturer/Factory, Group CorporationAverage Response Time: ≤6.01h

About Our Factory & Business Background

AddressLu Jia Cun Industrial Park, Qingdao, Shandong, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: 1-3 months

Our Production Capability & Technical Expertise

Main ProductsConcrete Batching Plant, Concrete Pipe Making Machine, Dry Mortar Mix Plant, Concrete Twin Shaft Mixer, Asphalt Mixing Plant, Asphalt Mixer, Self Loading Concrete Mixer, Pumps

Our Industry Experience & Global Business Record

Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe

Product Q&A

Q:What is the construction period per storey?
A:
The construction period is 3-5 days per storey.
Q:Is crane assistance required for installation?
A:
No, the system does not require crane assistance for shifting and assembly.
Q:What is the load capacity of the formwork?
A:
The load capacity is 60 KN per square meter.
Q:Do I need to plaster the walls after removing the formwork?
A:
No, the smooth effect after removing the formwork means there is no need to plaster.
Q:What is the scrap value of the aluminum formwork?
A:
The scrap value is about 50% of the new panel.

Send Inquiry

*To:SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Wall Formwork for High Rise Building Construction

Wall Formwork for High Rise Building Construction

US$50.00-100.00
1 Square Meter(MOQ)
Made-in-China.com