Powered by Made-in-China.com

Wall Formwork for Quick and Effective High Rise Building Construction
US$50.00-100.00
1 Square Meter
Product profile
Customization
AvailableAfter-sales Service
AvailableWarranty
1 YearsModel NO.
MPCertification
ISO, CEMaterial
SteelType
Wall FormworkCode
6061-T6Construction Period
5 DaysLoad Capacity
60knAfter Sale Service
AvailableTransport Package
StandardTrademark
MACPEXOrigin
ChinaHS Code
8480411000Production Capacity
50000Key features
No Plastering Required: Smooth surface after removal eliminates plastering costs and saves cleaning expenses.
High Load Capacity: Supports 60 KN per square meter ensuring stability and preventing formwork shifting.
Fast Construction Cycle: Achieves construction period of 3-5 days per storey for quick high-rise building.
Crane-Free Assembly: Does not require crane for shifting and assembly, optimizing crane usage for other tasks.
High Scrap Value: Scrap value is approximately 50% of the new panel cost, offering economic benefits.
Easy Installation: Workers can easily learn to install and dismantle formwork after a short training period.
Quality Material: Made from durable Aluminium alloy 6061-T6, firm enough to prevent bursting.
Certified Quality: Products hold ISO and CE certifications ensuring compliance with international standards.
Company profile
Business Type: Manufacturer/Factory, Group CorporationAverage Response Time: ≤5.66h
About Our Factory & Business Background
AddressLu Jia Cun Industrial Park, Qingdao, Shandong, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: 1-3 months
Our Production Capability & Technical Expertise
Main ProductsConcrete Batching Plant, Concrete Pipe Making Machine, Dry Mortar Mix Plant, Concrete Twin Shaft Mixer, Asphalt Mixing Plant, Asphalt Mixer, Self Loading Concrete Mixer, Pumps
Our Industry Experience & Global Business Record
Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe
Product Q&A
Q:What is the construction period per storey?
A:
The construction period is 3-5 days per storey.
Q:Does the formwork require a crane for installation?
A:
No, the formwork does not require a crane for shifting and assembly, allowing the crane to be used for other activities.
Q:Is plastering needed after removing the formwork?
A:
No, there is no need to plaster due to the smooth effect after removing the formwork.
Q:What is the load capacity of the formwork?
A:
The load capacity is 60 KN per square meter, which generates good integrality and uniform load.
Q:What is the scrap value of the aluminium formwork?
A:
The scrap value is about 50% of the new panel.
Send Inquiry
*To:
SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.
SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.*Content:
Supplier replies will be sent to your registered email
You may also like
High-Strength Aluminum Building Formwork for Fast Construction Projects
US$40.00
100 Square Meters(MOQ)
Quick and Convenient Concrete Mould Construction Plastic Formwork Shuttering
US$16.50-18.00
200 Square Meters(MOQ)
Sliding Suspension Shuttering Cantilever Climbing Formwork for High-Rise Building Wall Construction
US$220.00-380.00
200 Square Meters(MOQ)
Lianggong High Strength Steel and Aluminum Frame Formwork for Concrete Wall Column Construction
US$70.00-75.00
100 Square Meters(MOQ)
High Performance Lightweight Plastic Formwork for Slab and Column Building Works
US$8.90-15.00
100 Pieces(MOQ)
Industrial Easy Assemble High Quality Green Slab Formwork for High-Rise Building
US$1.99-199.00
5,000 Pieces(MOQ)
Lianggong Customizable Concrete Column Wall Slab Adjustable Steel Formwork for Building Tunnel Culvert Construction
US$388.00-588.00
30 Pieces(MOQ)
High Intensity Water Proof ABS PP Plastic Building Formwork for Concrete Construction
US$8.90-15.00
100 Pieces(MOQ)
Hunan Inno High Strength Steel Wall Formwork Mould for Building Construction
US$52.00
10 Square Meters(MOQ)
Lianggong High Strength Adjustable Drop Head Slab and Timber Beam Formwork for Efficient Concrete Slab and Beam Pouring
US$68.00-88.00
10 Square Meters(MOQ)
Heavy Duty Steel Frame Panel Wall Column Slab Concrete Pouring Construction Panel Formwork for Building
US$22.66-44.99
100 pieces(MOQ)
Concrete Mould Suspension Cantilever Climbing Jump Formwork for Concrete Form High-Rise Building
US$220.00-380.00
200 Square Meters(MOQ)
China Customized Durable Timber Beam Table Formwork for High-Rise Building Slab Construction
US$70.00
200 Square Meters(MOQ)
Steel Frame Formwork for Slabs Wall Columns Made of Adjustable Plastic Plywood for Building Concrete Construction
US$90.00-180.00
30 Square Meters(MOQ)
Reusable Concrete House Mold Plastic Formwork Panel for Concrete Wall Slab Construction Building
US$8.90-15.00
100 Pieces(MOQ)
Aluminium Frame Formwork System and Columns Formwork for Building Custom Concrete Wall Slab Aluminium Formwork for Building
US$85.00-130.00
100 Square Meters(MOQ)



















