Powered by Made-in-China.com

Wall Formwork for Quick and Effective High Rise Building Construction
US$50.00-100.00
1 Square Meter
Product profile
Customization
AvailableAfter-sales Service
AvailableWarranty
1 YearsModel NO.
MPCertification
ISO, CEMaterial
SteelType
Wall FormworkCode
6061-T6Construction Period
5 DaysLoad Capacity
60knAfter Sale Service
AvailableTransport Package
StandardTrademark
MACPEXOrigin
ChinaHS Code
8480411000Production Capacity
50000Key features
No Plastering Required: Smooth surface after removal eliminates plastering costs and saves cleaning expenses.
High Load Capacity: Supports 60 KN per square meter ensuring stability and preventing formwork shifting.
Fast Construction Cycle: Achieves construction period of 3-5 days per storey for quick high-rise building.
Crane-Free Assembly: Does not require crane for shifting and assembly, optimizing crane usage for other tasks.
High Scrap Value: Scrap value is approximately 50% of the new panel cost, offering economic benefits.
Easy Installation: Workers can easily learn to install and dismantle formwork after a short training period.
Quality Material: Made from durable Aluminium alloy 6061-T6, firm enough to prevent bursting.
Certified Quality: Products hold ISO and CE certifications ensuring compliance with international standards.
Company profile
Business Type: Manufacturer/Factory, Group CorporationAverage Response Time: ≤5.58h
About Our Factory & Business Background
AddressLu Jia Cun Industrial Park, Qingdao, Shandong, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: 1-3 months
Our Production Capability & Technical Expertise
Main ProductsConcrete Batching Plant, Concrete Pipe Making Machine, Dry Mortar Mix Plant, Concrete Twin Shaft Mixer, Asphalt Mixing Plant, Asphalt Mixer, Self Loading Concrete Mixer, Pumps
Our Industry Experience & Global Business Record
Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe
Product Q&A
Q:What is the construction period per storey?
A:
The construction period is 3-5 days per storey.
Q:Does the formwork require a crane for installation?
A:
No, the formwork does not require a crane for shifting and assembly, allowing the crane to be used for other activities.
Q:Is plastering needed after removing the formwork?
A:
No, there is no need to plaster due to the smooth effect after removing the formwork.
Q:What is the load capacity of the formwork?
A:
The load capacity is 60 KN per square meter, which generates good integrality and uniform load.
Q:What is the scrap value of the aluminium formwork?
A:
The scrap value is about 50% of the new panel.
Send Inquiry
*To:
SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.
SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.*Content:
Supplier replies will be sent to your registered email
You may also like
High-Strength Aluminum Building Formwork for Fast Construction Projects
US$40.00
100 Square Meters(MOQ)
Lianggong High Strength H20 Timber Beam Steel Aluminum Plastic Wall Column Slab Formwork for Concrete Construction
US$90.00-100.00
200 Square Meters(MOQ)
Quick and Convenient Concrete Mould Construction Plastic Formwork Shuttering
US$16.50-18.00
200 Square Meters(MOQ)
Durable Precast Plywood Concrete Frame Formwork Aluminum Formwork for Wall Column High-Rise Building
US$110.00-210.00
300 Square Meters(MOQ)
High-Quality Steel Formwork for Construction Projects and Concrete Pouring
US$52.00
100 Square Meters(MOQ)
Cost-Effective High-Efficiency Shuttering Steel Frame Plywood Formwork for Concrete Construction
US$85.00-130.00
300 Square Meters(MOQ)
Lianggong Manufacture Steel Climbing Tunnel Wall Column Concrete Adjustable Aluminum Metal Frame Formwork for Construction
US$80.00-90.00
500 Square Meters(MOQ)
Innovative Quick Lock Aluminum Formwork for High-Rise Construction
US$38.00-160.00
50 Square Meters(MOQ)
Hunan Inno High Strength Steel Wall Formwork Mould for Building Construction
US$52.00
10 Square Meters(MOQ)
Lianggong High Strength Steel and Aluminum Frame Formwork for Concrete Wall Column Construction
US$70.00-75.00
100 Square Meters(MOQ)
Songmao Building Plastic Concrete Form Work for Construction Wall Slab Climbing Formwork
US$6.99-16.99
5 pieces(MOQ)
Hollow Wall Slab Formwork for Concrete Shuttering Building Construction Instead Plywood
US$15.00-28.00
100 Bags(MOQ)
Industrial Easy Assemble High Quality Green Slab Formwork for High-Rise Building
US$1.99-199.00
5,000 Pieces(MOQ)
Sliding Suspension Shuttering Cantilever Climbing Formwork for High-Rise Building Wall Construction
US$220.00-380.00
200 Square Meters(MOQ)
Adjustable Wall Column Concrete Plastic Steel Aluminum Frame Formwork for Building Construction
US$52.99-55.99
100 Square Meters(MOQ)



















