Powered by Made-in-China.com

Mk-1094200192 Roller Assembly, Suit for Mining Machine
US$9,999.00
1 Piece
Product profile
After-sales Service
YesWarranty
6monthsCertification
CE, RoHS, ISO 9001:2000, ISO 9001:2008Model NO.
MK-1094200192Standard
AISI, ASME, BS, ANSI, JIS, GB, GOST, ASTM, DINSurface Treatment
Without ProcessingManufacturing Process
Precision MachiningMaterial
Alloy SteelShipping Cost
Negotiate with SupplierQuality Control
100% InspentionAverage Response Time
≤12hTransport Package
Standard Export PackingTrademark
OEMOrigin
PrcHS Code
847490000Production Capacity
50000pieces/YearKey features
Wide Compatibility: Compatible with Symons, Sadvik, Pegson, Telsmith, and Nordberg crushers.
Multiple Certifications: CE, RoHS, ISO 9001:2000, ISO 9001:2008, ISO14001, ISO45001:2018, ISO9001:2015.
Flexible Customization: Offers minor, full, design-based, and sample-based customization options.
Fast Response Time: Average response time is within 12 hours.
Quality Inspection: 100% inspection conducted for quality control.
Low MOQ: Minimum order quantity is 1 set.
Standard Compliance: Meets AISI, ASME, BS, ANSI, JIS, GB, GOST, ASTM, and DIN standards.
Short Lead Time: Peak and off-peak season lead time is within 15 workdays.
Company profile
CertifiedBusiness Type: Trading Company CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: N/A CertifiedNearest Port: Tianjin portAverage Response Time: ≤1.47h CertifiedTerms of Payment: LC, T/T, Small-amount payment, etc.
About Our Factory & Business Background
AddressBeijing, China
Plant Area210.83 square meters
Number of Employees16
Registered Capital9,000,000 RMB
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: within 15 workdays Off Season Lead Time: within 15 workdays
Minimum Order Quantity1set
Supply Chain Partners22
Our Production Capability & Technical Expertise
Main ProductsHydraulic lubrication system and accessories, hydraulic station and oil station,Crusher wear parts
R&D Engineers2 people
Our Industry Experience & Global Business Record
Year of Establishment2014-05-22
Main MarketsDomestic
Repeat Buyers Choice80%~100%
Number of Foreign Trading Staff9
Overseas Agent/BranchNo
New Products Launched in Last yearNo
Our Certifications, Standards & Industry Recognition
Management System CertificationISO14001, ISO45001:2018, ISO9001:2015
Cooperated with Fortune 500Yes
Product Q&A
Q:How to know the price?
A:
Price is the most important concern for every customer. If you want to know the price, you need to know the following details: product specifications, quantity, Shipping Cost etc. These are the main factors that determine the price. The more you order, the lower the unit price you get!
Q:Do you provide samples? Is it free or extra?
A:
Yes,but need to pay for it. Generally it is cheaper than the cost of normal products.
Q:How can you ensure the quality of your products?
A:
The production process will be carried out in accordance with regulations and there will be dedicated testing personnel for real-time testing, and 100% testing will be conducted before delivery.We promise to provide high-quality products and after-sales service. If there are any quality issues, please contact us promptly.
Q:After sales service?
A:
We promise to take responsibility for defective goods if there are quality issues that differ from those described in large-scale production.
Q:Are you able to make Non-standard or customized products?
A:
Yes, we can.
Send Inquiry
*To:
Beijing MK Minerals Technology Development Co., Ltd
Beijing MK Minerals Technology Development Co., Ltd*Content:
Supplier replies will be sent to your registered email
You may also like
Lh3673 Vibrating Screen Parts Accessories Cross Beam Assembly Ht-mm0610041 for Chile Quarry Mining Screening Machine
US$3,000.00-5,000.00
5 Pieces(MOQ)
3222310921 Drilling Spare Parts Epiroc Hose Assembly for Mining Machine Parts
US$1,000.00-10,000.00
1 Piece(MOQ)
Mining Machine Parts Bowl Assembly Ht-7090258001 for HP200 HP300 Gold Rock Cone Crusher Accessories
US$10,000.00-12,000.00
1 Piece(MOQ)
C190000905 Alloy Steel Forged Finger Assembly for Mining Machinery Parts
US$5.00-50.00
1 Piece(MOQ)
Bowl Assembly Ht-7090258002 Suit Mining Cone Crusher HP100 Machine Spare Parts
US$5,000.00-15,000.00
1 Piece(MOQ)
MP800 Tramp Release Cylinder Sub-Assembly for Mining Machinery Cone Crusher Spare Parts
US$2,700.00
2 Pieces(MOQ)
Assembly of Safety Coupling, Suit for Mk-CH890 Crusher, Mining Equipment Spare Parts
Negotiable
1 Piece(MOQ)
Mining Parts Vibrating Screen Suit Internal Housing Assembly Cvb1540 Cvb2060 Machine
US$3,000.00-5,000.00
1 Piece(MOQ)
Damage Proof Oil Pressure Power Transmission Moving Cone Assembly for Heavy Machinery
US$7,000.00
1 Piece(MOQ)
Head Assembly Mk-mm0407271 Suit for MP800 Cone Crusher
US$61,645.00
1 Piece(MOQ)
New Popularity Throw Balanced Design Mining Machinery Eccentric Assembly Parts for Mobile Crushing Plant Application
US$3,000.00-10,000.00
1 Piece(MOQ)
Smooth Drive Hydraulic Drive Easy Install Moving Cone Assembly for Heavy Machinery
US$7,000.00
1 Piece(MOQ)
Mining Machine Parts Head Assembly Assy Suit HP500
US$950.00-1,000.00
1 Piece(MOQ)
High-Strength Hammer Shaft Assembly for Crushing Machinery
US$40,000.00-50,000.00
1 Piece(MOQ)
Bearing Assembly Mk-488.0113-901 Suit for CV228 Jaw Crusher Spare Parts
US$6,000.00
1 Piece(MOQ)
Precision Over Shot Assembly for Enhanced Performance in Machinery
US$750.00
1 Piece(MOQ)



















