SourcingAI
Try for free
Powered by Made-in-China.com
Automatic Rotary Small-Scale Carbonated Drink Line Pet CSD Filling Machine
US$30,000.00
1 Piece

Product specifications

power

model number

machinery capacity

Product profile

Customization

Available

Warranty

1 Years Warranty

Type

Piston Filling Machine

Model NO.

CGN

Automatic Grade

Automatic

Material Type

Liquid

Filling Valve Head

Multi-Head

Structure

Rotary

Packaging

Bottle

Packaging Material

Plastic Core Compone

Selling Units

Single Item Single Vol

Filling Material

Carbonated Soft Drink Packaging Type

Packaging Type

Bottles

Control

PLC+ Touch Screen Filling Speed

Voltage

220/380V

Dimension(L*W*H)

1230*700*1400mm Suitable for

Bottle Type

Pet Plastic Bottle

Filling Volume

200ml-2000ml Processing

Filling Accuracy

%66 Place of Origin

Driven Type

Electric Application

Weight Kg

3000 Brand Name

Power

2 Kw~15 Kw Model

Transport Package

Woodbox

Trademark

MESURE

Origin

China

Key features

High-Speed Production: Rated capacity up to 24,000 bottles per hour for 500ml PET bottles.
Integrated 3-in-1 Design: Combines rinsing, constant-pressure filling, and precision capping in one enclosed unit.
PLC Intelligent Control: Features touch screen control, stepless variable frequency regulation, and fault display.
High-Precision Filling: Uses isobar filling principle with hard alloy cams for accurate liquid levels and sealing.
1-Year Warranty: Covers mechanical defects with free parts and labor for the first year.
Lifetime Technical Support: Provides lifelong technical guidance and regular visits after the warranty period.
Global Service Network: Engineers dispatched within 15 days for installation and staff training worldwide.
Auto CIP Cleaning: Equipped with automatic Clean-In-Place system for efficient hygiene maintenance.

Company profile

Jiangsu Mesure Machinery Co., Ltd.
Years of Export ExperienceExperienced TeamExhibition ExperiencePatents Awarded
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 10 Years CertifiedNearest Port: Shanghai PortAverage Response Time: ≤7.46h

About Our Factory & Business Background

AddressNo. 569, Xitang Road, Zhangjiagang City, Suzhou, Jiangsu, China
Plant Area7700 square meters
Number of Employees61
Registered Capital10,000,000 RMB
Terms of PaymentLC, T/T, D/P, PayPal, Western Union, Small-amount payment
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: 3-6 months Off Season Lead Time: 3-6 months
Minimum Order Quantity1 Set
Supply Chain Partners10

Our Production Capability & Technical Expertise

Main ProductsFilling Machine, Can Filling Machine, Water Filling Machine, CSD Filling Machine, Water Treatment System, Juice/Water/CSD Bottling Line, Beverage Preparation System, Beer Filling Machine, Glass Bottle Filling Machine, Pet Bottle Blowing Filling Capping Machine
Production Lines2
Production MachinesSawing Machine, CNC Lathe, Lathe, Wire Cutting Machine, Machining Center, Radial Drilling Machine, Plate Shearing Machine, Bending Machine
QA/QC inspectors1 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsHave instruction but no written records
R&D Engineers6 people
Traceability of Raw MaterialsYes

Our Industry Experience & Global Business Record

Year of Establishment2016-05-27
Main MarketsEurope, Southeast Asia/ Mideast, Africa
Repeat Buyers Choice< 10%
Number of Foreign Trading Staff10
Overseas Agent/BranchNo
New Products Launched in Last yearNo

Our Certifications, Standards & Industry Recognition

Management System CertificationISO9001:2015
Cooperated with Fortune 500No

Product Q&A

Q:When can I get engineers from you?
A:
Contact our sales team after preparing water, electricity, air supply, and production materials. We will dispatch an engineer within 15 days after visa cooperation is complete.
Q:When can I get my machine after I paid?
A:
Production time is typically 30-60 days, depending on the machine type. Shipping time varies based on your destination port.
Q:How to install my machines when it arrives? How much does it cost?
A:
We send engineers to your factory for installation and training. The customer covers round-trip air tickets, accommodation, and a fee of USD 200 per person per day.
Q:How long does installation take?
A:
Depending on the order, we send one or two engineers. Installation and training typically take 10 to 25 days.
Q:What about spare parts?
A:
We include one year's worth of easy-wear spare parts with the machine. During the warranty period, we supply spare parts at our cost, including delivery fees.

Send Inquiry

*To:Jiangsu Mesure Machinery Co., Ltd.Jiangsu Mesure Machinery Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like