Powered by Made-in-China.com
Bottle Liquid Filling Machine Usage Multi-Variety Pet Juice Production Line
US$35,000.00
1 Piece
Product specifications
power
machinery capacity
Product profile
Customization
AvailableAfter-sales Service
1 Years WarrantyWarranty
1 Years WarrantyModel NO.
PBCGYType
Piston Filling MachineAutomatic Grade
AutomaticMaterial Type
LiquidFilling Valve Head
Multi-HeadFeed Cylinder Structure
Multi-Room FeedingFilling Principle
PressureStructure
RotaryPackaging
BottlePackaging Material
PlasticKeywords
Fillng Machine Suitable forSelling Units
Single Item Single VolFilling Material
Power After-SalesPlace of Origin
Jiangsu,China Weight (KgPackaging Type
CartonsName
Bottle Liquid Filling Machine UsageMachinery Test Report
Provided Video Outgoing-InspectionProduct Name
Liquid Filling Machine FunctionSingle Gross Weight
0.0kgVoltage
220VAfter Warranty Service
Non -Man-Made Damaged Parts Bottle TypeVideo Outgoing-Inspection
ProvidedTransport Package
WoodboxTrademark
MESUREOrigin
ChinaKey features
Integrated 3-in-1 Design: Combines rinsing, filling, and capping in one enclosed structure for juice beverages.
High-Speed Efficiency: Rated capacity of 14,000 bottles per hour with PLC intelligent control.
Precision Filling Technology: Features high-precision valves with flow rate >125ml/s and constant-pressure filling.
Advanced Automation: Includes automatic CIP cleaning, centralized lubrication, and stepless variable frequency regulation.
Durable Construction: Main structures made of stainless steel with hard alloy capping cam profiles.
Comprehensive Warranty: Provides 1-year warranty covering non-man-made damaged parts and lifelong technical support.
Pre-shipped Spare Parts: Includes one year of easy-wearing spare parts shipped together with the machine.
Professional Installation: Engineers dispatched within 15 days for installation and staff training.
Company profile
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 10 Years CertifiedNearest Port: Shanghai PortAverage Response Time: ≤7.60h
About Our Factory & Business Background
AddressNo. 569, Xitang Road, Zhangjiagang City, Suzhou, Jiangsu, China
Plant Area7700 square meters
Number of Employees61
Registered Capital10,000,000 RMB
Terms of PaymentLC, T/T, D/P, PayPal, Western Union, Small-amount payment
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: 3-6 months Off Season Lead Time: 3-6 months
Minimum Order Quantity1 Set
Supply Chain Partners10
Our Production Capability & Technical Expertise
Main ProductsFilling Machine, Can Filling Machine, Water Filling Machine, CSD Filling Machine, Water Treatment System, Juice/Water/CSD Bottling Line, Beverage Preparation System, Beer Filling Machine, Glass Bottle Filling Machine, Pet Bottle Blowing Filling Capping Machine
Production Lines2
Production MachinesSawing Machine, CNC Lathe, Lathe, Wire Cutting Machine, Machining Center, Radial Drilling Machine, Plate Shearing Machine, Bending Machine
QA/QC inspectors1 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsHave instruction but no written records
R&D Engineers6 people
Traceability of Raw MaterialsYes
Our Industry Experience & Global Business Record
Year of Establishment2016-05-27
Main MarketsEurope, Southeast Asia/ Mideast, Africa
Repeat Buyers Choice< 10%
Number of Foreign Trading Staff10
Overseas Agent/BranchNo
New Products Launched in Last yearNo
Our Certifications, Standards & Industry Recognition
Management System CertificationISO9001:2015
Cooperated with Fortune 500No
Product Q&A
Q:When can I get engineers from you?
A:
Contact our sales people after finishing preparation conditions (water, electricity, air supply, materials). We will dispatch an engineer within 15 days after visa cooperation.
Q:When can I get my machine after I paid?
A:
Production time is around 30-60 days depending on the machine type. Shipping time depends on your destination port.
Q:How to install my machines when it arrives? How much the cost?
A:
We send engineers to install and train staff. Customer pays for round-trip air tickets, accommodation, and USD 200/day/person.
Q:How long time for installation?
A:
It takes about 10 to 25 days depending on the machine order.
Q:How about the spare parts?
A:
We send one year of easy broken spare parts with the machine. During warranty, we supply parts with our cost including delivery fees.
Send Inquiry
*To:
Jiangsu Mesure Machinery Co., Ltd.
Jiangsu Mesure Machinery Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
Liquid About 200L Drum Filling Machine Drum and Tote Filling Production Line for Solvent/Coating/Paint/Alcohol/Chemical Liquid
US$3,000.00-15,000.00
1 Piece(MOQ)
Industrial Hot Filling Production Line for Pulpy Juice, Fruit Concentrate and Vegetable Beverage
US$10,000.00-50,000.00
1 Piece(MOQ)
Full Automatic Oral Liquid Bottle Unscrambling Washing Filling Capping Labeling Production Line
US$23,800.00-36,500.00
1 Set(MOQ)
Full Automatic Essential Oil Bottle Unscrambling Washing Filling Capping Labeling Production Line
US$23,800.00-36,500.00
1 Set(MOQ)
Aluminum Beverage Cans Production Machine Cans Filling Line
US$12,600.00-18,800.00
1 Set(MOQ)
Automatic Plastic Bottle Glass Bottle Fresh Juice Filling Packaging Production Line
US$12,000.00-45,000.00
1 Set(MOQ)
a to Z Soft Beverage Table Filler Pure Mineral Pet Bottled Water Drink Fully Automatc Production Line
US$9,800.00-58,000.00
1 Piece(MOQ)
4 Heads Automatic Spray Bottle Sorting Filling Capping Labeling Production Line
US$9,500.00-13,500.00
1 Set(MOQ)
Automatic Pet Bottle Carbonated Beverage Drinks Washing Filling Capping Packaging Production Line
US$15,000.00-38,000.00
1 Set(MOQ)


















