SourcingAI
Try for free
Powered by Made-in-China.com
Bottle Liquid Usage Provided Video Outgoing-Inspection Efficient Juice Line Beverage Filling Machine
US$35,000.00
1 Piece

Product specifications

power

machinery capacity

Product profile

Customization

Available

Keywords

Fillng Machine Suitable for

Selling Units

Single Item Single Vol

Model NO.

PBCGY

Filling Material

Power After-Sales

Place of Origin

Jiangsu,China Weight (Kg

Packaging Type

Cartons

Name

Bottle Liquid Filling Machine Usage

Machinery Test Report

Provided Video Outgoing-Inspection

Product Name

Liquid Filling Machine Function

Single Gross Weight

0.0kg

Voltage

220V

Warranty

1year Filling Accura

After Warranty Service

Non -Man-Made Damaged Parts Bottle Type

Video Outgoing-Inspection

Provided

Key features

Integrated 3-in-1 Design: Combines rinsing, filling, and capping in one enclosed structure for juice beverages.
High-Speed Capacity: Rated capacity of 14,000 bottles per hour for 500ml glass bottles.
Precision Filling Control: Features PLC intelligent control and high-precision filling valves with flow rate >125ml/s.
Advanced Capping System: Uses magnetic torque control and automatic cap sorting for consistent sealing.
Hygienic Rinsing Technology: Rotary rinsing with sterile water and drying, minimizing secondary pollution.
Comprehensive Warranty: 1-year warranty covering non-man-made damaged parts with lifetime technical support.
Pre-ship Testing: Machines run for over 8 hours before delivery with video proof provided.
Global Service Network: Engineers dispatched within 15 days for installation and staff training worldwide.

Company profile

CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 10 Years CertifiedNearest Port: Shanghai PortAverage Response Time: ≤10.31h

About Our Factory & Business Background

AddressNo. 18 of Nonglu Road (N), Zhangjiagang City, Jiangsu , China
Plant Area7700 square meters
Number of Employees61
Registered Capital10,000,000 RMB
Terms of PaymentLC, T/T, D/P, PayPal, Western Union, Small-amount payment
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: 3-6 months Off Season Lead Time: 3-6 months
Minimum Order Quantity1 Set
Supply Chain Partners10

Our Production Capability & Technical Expertise

Main ProductsFilling Machine, Filling Machinery, Beverage Machine, Juice/Water/CSD Bottling Line, Water Treatment System
Production Lines2
Production MachinesSawing Machine, CNC Lathe, Lathe, Wire Cutting Machine, Machining Center, Radial Drilling Machine, Plate Shearing Machine, Bending Machine
QA/QC inspectors1 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsHave instruction but no written records
R&D Engineers6 people
Traceability of Raw MaterialsYes

Our Industry Experience & Global Business Record

Year of Establishment2016-05-27
Main MarketsEurope, Southeast Asia/ Mideast, Africa
Repeat Buyers Choice< 10%
Number of Foreign Trading Staff10
Overseas Agent/BranchNo
New Products Launched in Last yearNo

Our Certifications, Standards & Industry Recognition

Management System CertificationISO9001:2015
Cooperated with Fortune 500No

Product Q&A

Q:When can I get engineers from you?
A:
After you finish preparation conditions (water, electricity, air supply, materials) and contact sales, we will dispatch an engineer. They will arrive within 15 days after visa cooperation.
Q:When can I get my machine after I paid?
A:
Production time is around 30-60 days, depending on the machine type. Shipping time depends on your destination port.
Q:How to install my machines when it arrives? How much the cost?
A:
We send engineers to install and train staff. Customer pays for round-trip air tickets, accommodation, and USD 200/day/person for the engineer.
Q:How long time for installation?
A:
Depending on the order, we send one or two engineers. Installation takes about 10 to 25 days.
Q:How about the spare parts?
A:
We send one year of easy-wearing spare parts with the machine. During warranty, we supply spare parts including delivery fees at our cost.

Send Inquiry

*To:Jiangsu Mesure Machinery Co., Ltd.Jiangsu Mesure Machinery Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Automatic Bottle Washing Machine for Juice Rum
Made-in-China.com
Rotary Bottle Rinsing Machine for Wine Bottling Line
Made-in-China.com