SourcingAI
Try for free
Powered by Made-in-China.com
Glass Bottle CSD Bottling Machine with Quick Changeover
US$50,000.00
1 Piece

Product specifications

power

model number

machinery capacity

Product profile

Customization

Available

Automatic Grade

Automatic Voltage

Application

Beverage

Keywords

Soda Water Filling Machine

Key Selling Points

Energy Saving Filling Accurac

Selling Units

Single Item Single PAC

Place of Origin

Jiangsu

Feature

High Effective

Filling Head

8-80 Filling Valve

Control

PLC+Touch Screen Feature

Advantage

20 Years Experiences

Brand Name

Mesure

Product Name

CO2 Gas Beverage Soda Water Filling Machine

Single Gross Weight

3000.0kg

Dimension(L*W*H)

2200X2300X2200mm

Machine Material

Stainless Steel304/316

Filling Accuracy

95%

Workshop Layout

Free Design Bottle Size

Transport Package

Wooden Case Package

Specification

Stainless Steel 304/316

Trademark

MESURE

Origin

Zhangjiang, Jiangsu, China

Key features

3-in-1 Monoblock Design: Integrates rinsing, filling, and capping into a single unit for efficient production.
Wide Capacity Range: Production capacity adjustable from 3000 to 48000 bottles per hour.
Turn-Key Solution: Complete line including water treatment, blowing, filling, labeling, and palletizing.
Stainless Steel Construction: Made of durable Stainless Steel 304/316 for hygiene and longevity.
PLC Control System: Automated control via PLC with touch screen for precise operation.
Multi-Cap Compatibility: Supports Ropp, Crown, and Ring-pull caps for various bottle types.
1-Year Warranty: Includes one-year guarantee with free spare parts and delivery fees during warranty.
Global Project Experience: Proven track record in Denmark, Netherlands, Finland, and Norway.

Company profile

Jiangsu Mesure Machinery Co., Ltd.
Years of Export ExperienceExperienced TeamExhibition ExperiencePatents Awarded
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 10 Years CertifiedNearest Port: Shanghai PortAverage Response Time: ≤6.36h

About Our Factory & Business Background

AddressNo. 569, Xitang Road, Zhangjiagang City, Suzhou, Jiangsu, China
Plant Area7700 square meters
Number of Employees61
Registered Capital10,000,000 RMB
Terms of PaymentLC, T/T, D/P, PayPal, Western Union, Small-amount payment
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: 3-6 months Off Season Lead Time: 3-6 months
Minimum Order Quantity1 Set
Supply Chain Partners10

Our Production Capability & Technical Expertise

Main ProductsFilling Machine, Can Filling Machine, Water Filling Machine, CSD Filling Machine, Water Treatment System, Juice/Water/CSD Bottling Line, Beverage Preparation System, Beer Filling Machine, Glass Bottle Filling Machine, Pet Bottle Blowing Filling Capping Machine
Production Lines2
Production MachinesSawing Machine, CNC Lathe, Lathe, Wire Cutting Machine, Machining Center, Radial Drilling Machine, Plate Shearing Machine, Bending Machine
QA/QC inspectors1 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsHave instruction but no written records
R&D Engineers6 people
Traceability of Raw MaterialsYes

Our Industry Experience & Global Business Record

Year of Establishment2016-05-27
Main MarketsEurope, Southeast Asia/ Mideast, Africa
Repeat Buyers Choice< 10%
Number of Foreign Trading Staff10
Overseas Agent/BranchNo
New Products Launched in Last yearNo

Our Certifications, Standards & Industry Recognition

Management System CertificationISO9001:2015
Cooperated with Fortune 500No

Product Q&A

Q:When can I get engineers from you?
A:
After you finish preparation conditions (water, electricity, air, materials) and contact sales, we will dispatch an engineer. Once visa is secured, the engineer arrives within 15 days.
Q:When can I get my machine after I paid?
A:
Production time is around 30-60 days depending on the machine type. Shipping time varies based on your destination port.
Q:How to install my machines when it arrives? how much the cost?
A:
We send engineers to install and train staff. Customer pays for round-trip air tickets, accommodation, and USD200/day/person.
Q:How long time for installation?
A:
We send one or two engineers. Installation takes about 10 to 25 days depending on the order.
Q:How about the spare parts?
A:
We send one year of easy broken spare parts with the machine. During warranty, we supply parts with our cost including delivery fees.

Send Inquiry

*To:Jiangsu Mesure Machinery Co., Ltd.Jiangsu Mesure Machinery Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Beverage Bottle Water Can Glass Bottle Packer Packing Machine
Made-in-China.com