Powered by Made-in-China.com
High-Efficiency Automatic CSD Soft Drink Filling Machine for Sale
US$30,000.00
1 Piece
Product specifications
power
model number
machinery capacity
Product profile
Customization
AvailableWarranty
1 Years WarrantyType
Piston Filling MachineModel NO.
CGNAutomatic Grade
AutomaticMaterial Type
LiquidFilling Valve Head
Multi-HeadStructure
RotaryPackaging
BottlePackaging Material
Plastic Core ComponeSelling Units
Single Item Single VolFilling Material
Carbonated Soft Drink Packaging TypePackaging Type
BottlesControl
PLC+ Touch Screen Filling SpeedVoltage
220/380VDimension(L*W*H)
1230*700*1400mm Suitable forBottle Type
Pet Plastic BottleFilling Volume
200ml-2000ml ProcessingDriven Type
Electric ApplicationPower
2 Kw~15 Kw ModelTransport Package
WoodboxTrademark
MESUREOrigin
ChinaKey features
High-Speed Production: Rated capacity up to 24,000 BPH for 500ml bottles with isobar filling principle.
Integrated 3-in-1 Design: Combines rinsing, filling, and capping in one enclosed structure for efficiency.
PLC Intelligent Control: Features PLC control, touch screen, and automatic fault display for easy operation.
Precision Filling: High-precision filling valves ensure accurate liquid levels and reliable sealing.
1-Year Warranty: Includes 1-year quality guarantee with free spare parts and delivery during warranty.
Lifetime Technical Support: Provides life-long technical support and regular visits to ensure customer satisfaction.
Engineer Installation: Professional engineers dispatched to install machines and train staff within 15 days.
Standard Export Packing: Uses export plywood cases and thick cartons to ensure product safety during transit.
Company profile
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 10 Years CertifiedNearest Port: Shanghai PortAverage Response Time: ≤7.41h
About Our Factory & Business Background
AddressNo. 569, Xitang Road, Zhangjiagang City, Suzhou, Jiangsu, China
Plant Area7700 square meters
Number of Employees61
Registered Capital10,000,000 RMB
Terms of PaymentLC, T/T, D/P, PayPal, Western Union, Small-amount payment
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: 3-6 months Off Season Lead Time: 3-6 months
Minimum Order Quantity1 Set
Supply Chain Partners10
Our Production Capability & Technical Expertise
Main ProductsFilling Machine, Can Filling Machine, Water Filling Machine, CSD Filling Machine, Water Treatment System, Juice/Water/CSD Bottling Line, Beverage Preparation System, Beer Filling Machine, Glass Bottle Filling Machine, Pet Bottle Blowing Filling Capping Machine
Production Lines2
Production MachinesSawing Machine, CNC Lathe, Lathe, Wire Cutting Machine, Machining Center, Radial Drilling Machine, Plate Shearing Machine, Bending Machine
QA/QC inspectors1 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsHave instruction but no written records
R&D Engineers6 people
Traceability of Raw MaterialsYes
Our Industry Experience & Global Business Record
Year of Establishment2016-05-27
Main MarketsEurope, Southeast Asia/ Mideast, Africa
Repeat Buyers Choice< 10%
Number of Foreign Trading Staff10
Overseas Agent/BranchNo
New Products Launched in Last yearNo
Our Certifications, Standards & Industry Recognition
Management System CertificationISO9001:2015
Cooperated with Fortune 500No
Product Q&A
Q:When can I get engineers from you?
A:
After you finish preparation conditions (water, electricity, air supply, materials) and contact sales, we will dispatch an engineer within 15 days after visa cooperation.
Q:When can I get my machine after I paid?
A:
Production time is around 30-60 days depending on the machine type. Shipping time depends on your destination port.
Q:How to install my machines when it arrives? How much does it cost?
A:
We send engineers to install and train staff. Customer pays for round-trip air tickets, accommodation, and USD 200/day/person for the engineer.
Q:How long does installation take?
A:
Depending on the order, we send one or two engineers. Installation typically takes about 10 to 25 days.
Q:What about the spare parts?
A:
We send one year's worth of easy-wear spare parts with the machine. During warranty, we supply spare parts at our cost, including delivery fees.
Send Inquiry
*To:
Jiangsu Mesure Machinery Co., Ltd.
Jiangsu Mesure Machinery Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
Carbonated Drink Production Line Soft Drink Beverage Bottled Filling Machine Price
US$25,000.00-30,000.00
1 Piece(MOQ)
Rotary Type Automatic Aluminum Can Beverage Filler Machinery Beer Carbonated Soft Drink CSD Filling Machine Bottling Line
US$45,000.00-50,000.00
1 Piece(MOQ)
High Speed Rotary Liquid Filling Machine for Small Bottle Spring Water Soft Drinks Bottling
US$1,500.00-60,000.00
1 Piece(MOQ)
Carbonated Beverage Drink Making Machine Pet Bottle CSD Filling Production Line Soda Water Bottling Machine
US$13,500.00-13,800.00
1 sets(MOQ)
Automatic Soft Energy Drinks Fruit Juice Carbonated Beverage Filling Sparkling Water Making Machine
US$13,000.00-150,000.00
1 Piece(MOQ)
Factory Price Soft Drink Filling Machinery / Soda Filling Machine / CSD Filling Machine
US$2,500.00-50,000.00
1 Piece(MOQ)
Complete Carbonated Soft Drink Production Line / Bottling Machine / Pet Bottle CSD Washing Filling Capping Machine
US$13,000.00-15,000.00
1 Piece(MOQ)



















