SourcingAI
Try for free
Powered by Made-in-China.com
Premium Automatic CSD Filling Line for Beverage Production
US$30,000.00
1 Piece

Product specifications

power

model number

machinery capacity

Product profile

Customization

Available

Warranty

1 Years Warranty

Type

Piston Filling Machine

Model NO.

CGN

Automatic Grade

Automatic

Material Type

Liquid

Filling Valve Head

Multi-Head

Structure

Rotary

Packaging

Bottle

Packaging Material

Plastic Core Compone

Selling Units

Single Item Single Vol

Filling Material

Carbonated Soft Drink Packaging Type

Packaging Type

Bottles

Control

PLC+ Touch Screen Filling Speed

Voltage

220/380V

Dimension(L*W*H)

1230*700*1400mm Suitable for

Bottle Type

Pet Plastic Bottle

Filling Volume

200ml-2000ml Processing

Filling Accuracy

%66 Place of Origin

Driven Type

Electric Application

Weight Kg

3000 Brand Name

Power

2 Kw~15 Kw Model

Transport Package

Woodbox

Trademark

MESURE

Origin

China

Key features

High-Speed Production: Rated capacity up to 24,000 BPH for 500ml bottles.
Integrated 3-in-1 Design: Combines rinsing, filling, and capping in one enclosed unit.
Precision Isobar Filling: Uses constant pressure mechanism for high accuracy filling.
PLC Intelligent Control: Features touch screen control and automatic fault display.
1-Year Warranty: Covers mechanical defects with free parts and labor.
Lifetime Technical Support: Provides ongoing consultation and guidance after sale.
Engineer Installation: Dispatches engineers within 15 days for installation and training.
Free Spare Parts: Includes one year of essential spare parts with the machine.

Company profile

Jiangsu Mesure Machinery Co., Ltd.
Years of Export ExperienceExperienced TeamExhibition ExperiencePatents Awarded
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 10 Years CertifiedNearest Port: Shanghai PortAverage Response Time: ≤7.98h

About Our Factory & Business Background

AddressNo. 569, Xitang Road, Zhangjiagang City, Suzhou, Jiangsu, China
Plant Area7700 square meters
Number of Employees61
Registered Capital10,000,000 RMB
Terms of PaymentLC, T/T, D/P, PayPal, Western Union, Small-amount payment
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: 3-6 months Off Season Lead Time: 3-6 months
Minimum Order Quantity1 Set
Supply Chain Partners10

Our Production Capability & Technical Expertise

Main ProductsFilling Machine, Can Filling Machine, Water Filling Machine, CSD Filling Machine, Water Treatment System, Juice/Water/CSD Bottling Line, Beverage Preparation System, Beer Filling Machine, Glass Bottle Filling Machine, Pet Bottle Blowing Filling Capping Machine
Production Lines2
Production MachinesSawing Machine, CNC Lathe, Lathe, Wire Cutting Machine, Machining Center, Radial Drilling Machine, Plate Shearing Machine, Bending Machine
QA/QC inspectors1 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsHave instruction but no written records
R&D Engineers6 people
Traceability of Raw MaterialsYes

Our Industry Experience & Global Business Record

Year of Establishment2016-05-27
Main MarketsEurope, Southeast Asia/ Mideast, Africa
Repeat Buyers Choice< 10%
Number of Foreign Trading Staff10
Overseas Agent/BranchNo
New Products Launched in Last yearNo

Our Certifications, Standards & Industry Recognition

Management System CertificationISO9001:2015
Cooperated with Fortune 500No

Product Q&A

Q:When can I get engineers from you?
A:
Contact us after preparation conditions are met. We will dispatch an engineer within 15 days for installation and training.
Q:When can I get my machine after I paid?
A:
Production takes 30-60 days depending on the model. Shipping time depends on your destination port.
Q:How to install my machines when it arrives? how much the cost?
A:
We send engineers to install and train staff. Customer pays for air tickets, accommodation, and USD 200/day/person.
Q:How long time for installation?
A:
Installation typically takes 10 to 25 days, depending on the order and number of engineers sent.
Q:How about the spare parts?
A:
We include one year of spare parts with the machine. During warranty, we supply parts with our cost including delivery.

Send Inquiry

*To:Jiangsu Mesure Machinery Co., Ltd.Jiangsu Mesure Machinery Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like