SourcingAI
Try for free
Powered by Made-in-China.com
Shrink Wrapping Machine with Automatic Film Feeding & Sealing
US$35,000.00
1 Piece

Product specifications

power

model number

machinery capacity

Product profile

Customization

Available

After-sales Service

Overseas Installing Service

Warranty

1 Year

Application

Food

Packaging

Film

Automatic Grade

Automatic

Driven Type

Electric

Manner of Packing

Both Ends Open

Adjust Speed

Frequency Conversion Speed Regulation

Type

PE Shrink Film Machine

Heating Mode

Stainless Steel Heating

Packaging Material

Film

Film Material

PE, POF, PVC (Other Shrink Films Upon Request)

Film Thickness

0.05-0.10 mm (PE) / 0.012 -0.025 mm (POF)

Packing Speed

10 -40 Packs Per Minute

Packing Pattern

2×3, 3×4, 4×6, or Customizable

Product Height Range

50 - 400 mm

Product Diameter Range

30 - 120 mm

Film Roll Width

200 -800 mm (Adjustable)

Sealing Method

Hot Knife Sealing / Constant Heat Sealing

Shrink Tunnel Heating

Electric Heating / Steam Heating (Optional)

Shrink Tunnel Temperature

120- 200℃ (Adjustable)

Shrink Tunnel Conveyor Speed

Variable Speed by Frequency Inverter

Control System

PLC + HMI Touch Screen (Siemens or Equivalent)

Power Supply

380V / 50Hz (3-Phase)

Total Power

15 -45 Kw (Depending on Configuration)

Air Pressure

0.6-0.8 MPa (for Pneumatic Systems)

Transport Package

Wooden Case

Specification

2000-24000CPH

Trademark

MESURE

Origin

Zhangjiagang, Jiangsu, China

Key features

Fully Automatic
High Accuracy

Company profile

CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 10 Years CertifiedNearest Port: Shanghai PortAverage Response Time: ≤10.32h

About Our Factory & Business Background

AddressNo. 18 of Nonglu Road (N), Zhangjiagang City, Jiangsu , China
Plant Area7700 square meters
Number of Employees61
Registered Capital10,000,000 RMB
Terms of PaymentLC, T/T, D/P, PayPal, Western Union, Small-amount payment
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: 3-6 months Off Season Lead Time: 3-6 months
Minimum Order Quantity1 Set
Supply Chain Partners10

Our Production Capability & Technical Expertise

Main ProductsFilling Machine, Filling Machinery, Beverage Machine, Juice/Water/CSD Bottling Line, Water Treatment System
Production Lines2
Production MachinesSawing Machine, CNC Lathe, Lathe, Wire Cutting Machine, Machining Center, Radial Drilling Machine, Plate Shearing Machine, Bending Machine
QA/QC inspectors1 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsHave instruction but no written records
R&D Engineers6 people
Traceability of Raw MaterialsYes

Our Industry Experience & Global Business Record

Year of Establishment2016-05-27
Main MarketsEurope, Southeast Asia/ Mideast, Africa
Repeat Buyers Choice< 10%
Number of Foreign Trading Staff10
Overseas Agent/BranchNo
New Products Launched in Last yearNo

Our Certifications, Standards & Industry Recognition

Management System CertificationISO9001:2015
Cooperated with Fortune 500No

Product Q&A

Q:When can I get engineers from you?
A:
When you finish the Preparation conditions(water resource,electricity,air supply,production materials)contact with our sales people we will dispatch engineer to install the machine for you ,and train your employees to use the machine well. Normally when your preparation is done,you can contact with our sales people and cooperate us to get the visa for the engineer and our engineerwill be there within 15 days.
Q:When can I get my machine after I paid?
A:
Normally production time is around 30-60days,the exactly depend on what kind of machine you order.The shipping time is based on your destination port.
Q:How to install my machines when it arrives?how much the cost?
A:
We will send our engineers to your factory to install the machines and train your staff how to operate the machines. Customer pay airtickets go and back,accommodation and USD200/day/person.
Q:How long time for installation?
A:
According your machines order,we will send one or two engineers to your plant,it will take about 10 days to 25 days.
Q:How about the spare parts?
A:
We will send one year enough easy broken spare parts together with the machines,shipping together.During the warranty time, we will supply the spare parts with our cost including the delivery fees.

Send Inquiry

*To:Jiangsu Mesure Machinery Co., Ltd.Jiangsu Mesure Machinery Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like