Business Type: Manufacturer/Factory CertifiedR&D Capacity: ODM Service AvailableExport Year: 2009-09-12Nearest Port: Shanghai, zhangjiagang, NanjingAverage Response Time: ≤7.20hTerms of Payment: LC, T/T, D/P, etc.
AI-Powered supplier vetting
SummarySuzhou Midtech Industry Co., Ltd is a leading plastic extrusion technology manufacturer in China, established in 2009. The company has significant R&D capabilities, offering flexible and full customization services, with a strong export focus, contributing 71% to 90% of total sales. Despite lacking in-stock and overseas warehousing capabilities, it maintains a presence at international trade shows and adheres to quality assurance and effective customer complaint mechanisms.
Supplier typeSuzhou Midtech Industry Co., Ltd is a trade company specializing in plastic extrusion technology based in Zhangjiagang, Suzhou.
After-Sales capabilityThe company has an after-sales service team with experienced engineers, indicating a structured after-sales service capability.
R&D capabilityThe supplier emphasizes manufacturing, innovation, and dedication, with significant R&D capabilities and the ability to provide 3D software design services.
Production capacityThe supplier has a diverse production output including various extrusion systems with a total of 70 sets produced annually.
Customization capabilityThe supplier offers a wide range of customization services, from samples to full customization, supported by their R&D capabilities.
Product Q&A
Q:What is the warranty period for the machine?
A:
We provide a super extended sales guarantee of 18 months starting from the date the machine leaves the supplier plant.
Q:What is the production capacity of the line?
A:
The output capacity varies by model, ranging from 20-30 kg/h for MT45 to 30-40 kg/h for MT50.
Q:Do you offer customized solutions?
A:
Yes, we provide customized plastic extrusion solutions and turn-key services including plant layout, design, and formula.
Q:Where are your after-sales service centers located?
A:
We have a worldwide after-sales service network including locations in Hungary, Spain, Nigeria, UAE, Brazil, and Peru.
Q:What is the lead time for delivery?
A:
The lead time is 1-3 months during the off-season and 3-6 months during the peak season.
Send Inquiry
*To:Suzhou Midtech Industry Co., Ltd.
*Content:
0/4000
Supplier replies will be sent to your registered email