SourcingAI
Try for free
Powered by Made-in-China.com
Consulting for on Grid off Grid Distributed Energy Storage System Solar Panel Charging Bess
US$1.00
1 Piece

Product profile

Customization

Available

Application

Commercial Complex Peak Shaving

Installation

Cabinet Floor-Mounted

Model NO.

bess3

Energy Capacity

500kWh-1MWh

Power Configuration

100kW-250kW

Cycle Life

3000 Cycles (80%DOD)

Cooling Method

Full Liquid Cooling (Temperature Difference ≤3℃)

Key features

Customized BESS Solutions: Tailored system architecture based on specific load profiles, grid conditions, and economic goals.
Full Liquid Cooling: Advanced cooling technology ensuring temperature difference is less than 3 degrees Celsius.
Long Cycle Life: LFP battery technology providing 3000 cycles at 80% Depth of Discharge.
AI-Powered Optimization: Intelligent EMS with cloud monitoring and analytics for continuous performance improvement.
Multi-Application Support: Supports peak shaving, load shifting, backup power, microgrid operation, and EV charging.
Comprehensive Certifications: Certified with ISO, CE, IEC, TUV, and GB/T standards for global compliance.
Scalable Capacity: Flexible energy capacity from 500kWh to 1MWh and power from 100kW to 250kW.
End-to-End Service: Includes pre-sales project design, turnkey engineering, and 12-year after-sales warranty.

Company profile

Business Type: OtherAverage Response Time: ≤1.30h

About Our Factory & Business Background

AddressRoom 705, Qinda Building, Dieyuan Road, Ningbo, Zhejiang, China
Average Lead TimePeak Season Lead Time: within 15 workdays Off Season Lead Time: one month

Our Production Capability & Technical Expertise

Main ProductsElectric Vehicle, Solar PV Panel, Solar PV System Solutions, EV Charging Infrastructure, Battery Energy Storage Systems (Bess), Battery Swaping Station, Intelligent Energy Management Systems (EMS), Energy Management Systems (EMS), Inverter, E-Motor(Electric Motorcycle)

Our Industry Experience & Global Business Record

Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe

Product Q&A

Q:What are the payment terms?
A:
T/T and L/C.
Q:Which certificates do you have?
A:
We have IEC 61215-IEC61215-1-1,IEC 61215-2,IEC 61730-1,IEC 61730-2, GB/T 19001,IOS9001,EN IEC 61215-1,EN IEC 61215-1-1,EN IEC 61215-2,EN IEC 61730-1,EN IEC 61730-2 etc. certificate.
Q:Can I order samples to test?
A:
Yes,we can sell samples to you.
Q:Do you provide after-sales service?
A:
Yes,the warranty is 12 years, if there's any quality problem during warranty period, we can send new components as replacement.
Q:What is the lead time for orders?
A:
Peak Season Lead Time: within 15 workdays. Off Season Lead Time: one month.

Send Inquiry

*To:MEET(Me Energy Technology Co., Ltd. )MEET(Me Energy Technology Co., Ltd. )
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

U1 Power 125kw 261kwh Battery Storage on-Grid EMS Solar Power
Made-in-China.com
Reliable off-Grid Energy Storage Solution for Microgrid Use
Made-in-China.com
off-Grid PV Energy Storage Supply Battery Powered System
Made-in-China.com