SourcingAI
Try for free
Powered by Made-in-China.com
Metal Sponge Holder Kitchen Counter Top Sink Organizer with Towel Rack
US$3.20
50-499 Pieces
US$2.80
500-9,999 Pieces
US$2.60
10,000+ Pieces
Sample price:US$5.50/piece.Request sample

Product profile

Material

Iron

Usage

Kitchenware Storage

Number of Layers

Two

Model NO.

KO-093

Feature

Common

Design

Sink Organizer

Packaging

Single

Color

White/Black

Size

Medium

Shape

Common

Brand

OEM

Transport Package

Carton

Specification

18.2*7.2*9.2cm

Trademark

OEM

Origin

China

HS Code

3924100000

Production Capacity

50000sets/Year

Key features

Customization Options: Offers full, flexible, and minor customization from samples or designs.
OEM & ODM Services: Professional design team supports OEM and ODM services for various categories.
Quality Control: 100% inspection of goods by dedicated QC team to ensure low defect rates.
Material & Design: Constructed from durable iron with a sink organizer design and towel rack.
Color Options: Available in White and Black color options to match kitchen decor.
Sample Lead Time: Sample production completed within 5 to 7 days after confirmation.
Order Lead Time: Standard order delivery takes approximately 30 days after deposit.
Warranty Coverage: Provides a 60-day quality warranty period after shipment.

Company profile

Market Union Co. Ltd.
Market Union Co. Ltd.Zhejiang, China
Business Type: Trading CompanyAverage Response Time: ≤15h

About Our Factory & Business Background

Address12F, Building B10(East Area), No. 2560, Yongjiang Avenue, Yinzhou District, Ningbo, Zhejiang, China.

Our Production Capability & Technical Expertise

Main ProductsN/A

Product Q&A

Q:Can I make my own design for small quantity orders?
A:
Yes, we can. We have our own professional design team and support low MOQ and different categories. Our strengths include our own warehouse.
Q:How do you control the quality?
A:
We have our own QC team. Every item and order undergoes inspection, and we send reports for your confirmation. We perform 100% inspection to ensure a very low defect rate.
Q:What is the delivery time?
A:
For samples, it takes about 5-7 days. For orders, it depends on quantity, normally about 30 days after receiving the deposit and confirming all details.
Q:What are your payment terms?
A:
We usually accept 30% T/T in advance and 70% before shipment or copy of BL. These terms can also be negotiated according to the order.
Q:How to make an order?
A:
1. Sample approval. 2. Client makes 30% deposit or opens LC after receiving PI. 3. Client approves PP sample and gets testing report if necessary. 4. Friday. 5. Arrange shipment. 6. Supplier arranges documents and sends copies. 7. Client effects balance payment. 8. Supplier sends original documents or telex release. 9. 60-day quality warranty after shipment.

Send Inquiry

*To:Market Union Co. Ltd.Market Union Co. Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like