SourcingAI
Try for free
Powered by Made-in-China.com
OEM Custom Steel Lost Wax Casting Investment Casting Machine Part
US$2.30-10.65
100 Pieces
Sample price:US$1.00/piece.Request sample

Product profile

Customization

Available

Casting Method

Lost Wax Casting/Investment Casting

Casting Form Material

Metal

Casting Metal

Stainless Steel, Aluminum, Ci etc.

Casting Form Usage Count

Permanent

Surface Treatment

Sand Blast

Surface Roughness

Ra12.5

Coating

Customized

Machining Tolerance

+/-0.01mm

Standard

AISI/ASME/ANSI/JIS/GB/DIN

Certification

ISO 9001:2008, IATF16949

Transport Package

Protective Bubble+Paper Carton+Wooden Case

Specification

Custom metal parts

Trademark

N/A

Origin

China

Production Capacity

500000pieces/Year

Key features

ISO & IATF Certified: Certified with ISO 9001:2008 and IATF16949 for quality assurance.
High Precision Machining: Positioning accuracy of 0.008mm and surface roughness Ra0.8~6.3um.
Wide Material Options: Supports Carbon steel, alloy steel, stainless steel, aluminum, and more.
Custom Coating Service: Offers customized coating options including KTL, Zinc plating, and painting.
Comprehensive Manufacturing: Integrates casting, forging, and CNC machining for complete solutions.
Fast Response Time: Guaranteed reply within 0.5 hours for inquiries and drawings.
Large Size Capacity: Max linear size 1200mm and diameter 600mm for large parts.
100% Quality Inspection: Strict 0 defects policy with 100% inspection before packing.

Company profile

Ningbo Yinzhou Muyang Machinery Co., Ltd.
High Repeat Buyers ChoiceFast DeliveryRaw-Materials TraceabilityManagement Certification
Business Type: Manufacturer/FactoryExport Year: 2009-01-01Nearest Port: Ningbo, ShanghaiAverage Response Time: ≤18hTerms of Payment: LC, T/T, D/P, etc.International Commercial Terms(Incoterms): FOB, CFR, CIF, EXW, Others

About Our Factory & Business Background

AddressRenxin Village Yunlong Town, Yinzhou District, Ningbo, Zhejiang, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: one month

Our Production Capability & Technical Expertise

Main ProductsCNC Aluminum Part, CNC Machining Part, Forging Parts, Motorcycle Parts, Auto Parts, Shaft, Hardware, Train Parts, Hinge, Bolt and Nut

Our Industry Experience & Global Business Record

Main MarketsNorth America, South America, Eastern Europe, Africa, Western Europe

Product Q&A

Q:Are you a manufacturer or trading company?
A:
We are a manufacturer with self-export rights.
Q:How quickly do you reply to inquiries?
A:
We will reply within 0.5 hours.
Q:What is the lead time for tooling?
A:
The lead time for tooling is 25-35 days.
Q:What is the lead time for material production?
A:
The lead time for material is 5-7 days.
Q:What is the lead time for sampling?
A:
The lead time for sampling is 7-15 days.

Send Inquiry

*To:Ningbo Yinzhou Muyang Machinery Co., Ltd.Ningbo Yinzhou Muyang Machinery Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

OEM Customized Lost Wax Casting Pump Machinery Parts
Made-in-China.com
OEM Cast Steel Investment Casting Valve Part
Made-in-China.com
OEM Custom Investment Casting Part
Made-in-China.com
Custom Lost Wax Investment Casting Parts

Custom Lost Wax Investment Casting Parts

US$1.00-50.00
50 Pieces(MOQ)
Made-in-China.com