SourcingAI
Try for free
Powered by Made-in-China.com
Stainless Steel Precise Investment Casting Lost Wax Casting CNC Machining Machine Spare Part
US$0.10-4.25
300 Pieces
Sample price:US$1.00/piece.Request sample

Product profile

Customization

Available

Casting Method

Investment / Lost Wax / Die Casting

Casting Form Material

Mud/Metal/Sand/Graphite

Casting Metal

Steel/Aluminum/Iron etc.

Casting Form Usage Count

Permanent

Surface Treatment

Sand Blast/Powder Coating/Electroplating/Polishing

Surface Roughness

Ra12.5

Coating

Powder Coating/Polishing/Eletroplating/Others

Machining Tolerance

+/-0.01mm

Standard

ASTM

Certification

ISO 9001:2008, IATF16949

Drawing Format

Pdf, 3D, Setp etc.

Secondary Service

Heat Treatment, Surface Treatment, etc.

Factory Location

Ningbo

Transport Package

Protective Bubble+Paper Carton+Wooden Case

Specification

Custom metal parts

Trademark

N/A

Origin

China

Production Capacity

500000pieces/Year

Key features

Comprehensive Manufacturing Services: Capability of casting, forging, and machining with self-export rights.
High Precision Machining: Positioning accuracy 0.008mm, Rep. position accuracy 0.006mm.
Wide Material Selection: Carbon steel, alloy steel, stainless steel, aluminum, iron, etc.
Extensive Surface Treatment: Sand blast, powder coating, electroplating, polishing, KTL, etc.
Global Industry Experience: Serving automotive, railway, oil, medical, and construction sectors for 15+ years.
Strict Quality Control: 0 defects target with 100% inspection before packing.
ISO and IATF Certified: Certified ISO 9001:2008 and IATF16949 compliant.
Custom Packaging Options: Standard pearl cotton/carton or custom packaging with wooden box.

Company profile

Ningbo Yinzhou Muyang Machinery Co., Ltd.
High Repeat Buyers ChoiceFast DeliveryRaw-Materials TraceabilityManagement Certification
Business Type: Manufacturer/FactoryExport Year: 2009-01-01Nearest Port: Ningbo, ShanghaiAverage Response Time: ≤24hTerms of Payment: LC, T/T, D/P, etc.International Commercial Terms(Incoterms): FOB, CFR, CIF, EXW, Others

About Our Factory & Business Background

AddressRenxin Village Yunlong Town, Yinzhou District, Ningbo, Zhejiang, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: one month

Our Production Capability & Technical Expertise

Main ProductsCNC Aluminum Part, CNC Machining Part, Forging Parts, Motorcycle Parts, Auto Parts, Shaft, Hardware, Train Parts, Hinge, Bolt and Nut

Our Industry Experience & Global Business Record

Main MarketsNorth America, South America, Eastern Europe, Africa, Western Europe

Product Q&A

Q:Are you a manufacturer or trading company?
A:
We're a manufacturer with self-export rights.
Q:How quickly do you reply to inquiries?
A:
Directly get to CONTACT or send your product drawing/inquiries to email, we will reply within 0.5 hour.
Q:What are the typical lead times for tooling and production?
A:
Tooling takes 25-35 days, material 5-7 days, sampling 7-15 days, rough parts mass production 30-50 days, heat treatment 5-7 days, and machining production 10-30 days.
Q:What materials and casting methods do you use?
A:
We use carbon steel, alloy steel, stainless steel, etc., with investment, lost wax, and die casting methods.
Q:What is your quality standard?
A:
We ensure 0 defects and perform 100% inspection before packing.

Send Inquiry

*To:Ningbo Yinzhou Muyang Machinery Co., Ltd.Ningbo Yinzhou Muyang Machinery Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like