Powered by Made-in-China.com
700tpd Low-Temperature Heat Pump Distillation Column Unit
US$8,700.00-75,900.00
1 Piece
Product specifications
model
Product profile
Customization
AvailableAfter-sales Service
7*24hWarranty
1yearModel NO.
KJH-DLI-6152Certification
ISOApplication
Heater, Cooler, Vaporizer, CondenserPrinciple
Evaporation CrystallizationStyle
Steel TypeMaterial
SteelProduct Name
Tube Type EvaporatorIndustry
WastewaterOptional Process
Vacuum Tube-Type Skid-Mounted Forced CirculationFeatures
Energy-Efficient and Eco-FriendlySalt Content
Sulfate/Nitrate/Potassium-Sodium SaltHeat Exchange
Plate-Type / Tubular-TypeSpecification
KJH-FF-8676Trademark
conqinphiOrigin
Qingdao, ChinaProduction Capacity
900Key features
Energy Efficiency: Reduces energy consumption by 30%-50% compared to multi-effect evaporators using mechanical vapor recompression.
High Automation: Features a high degree of automation with stable operation and small footprint for easy management.
ISO Compliance: Certified with ISO standards and ISO9001:2015, ISO45001:2018 management system certifications.
Flexible Customization: Offers flexible, minor, and full customization options including designs and samples.
24/7 Support: Provides 7*24h after-sales service with a 1-year warranty period for all equipment.
Versatile Application: Suitable for electroplating, metallurgy, lithium batteries, pharmaceuticals, and food processing industries.
Compact Design: Compact structure with small footprint and rarely required cooling water consumption.
High Evaporation Efficiency: Utilizes secondary steam compression cycle for efficient heating and heat-sensitive material processing.
Company profile
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 1 year CertifiedNearest Port: Qingdao PortAverage Response Time: ≤3.49h
About Our Factory & Business Background
AddressAbout 220 meters north of the intersection of Lanzhou East Road and Zhanqian Avenue, Jiaozhou City, Shandong Province, on the east side of the road
Plant Area25000 square meters
Number of Employees176
Registered Capital50,000,000 RMB
Terms of PaymentT/T, LC, D/P, PayPal, Western Union, Small-amount payment
International Commercial Terms(Incoterms)EXW, CFR, CIF, FOB
Average Lead TimePeak Season Lead Time: 1-3 months Off Season Lead Time: 1-3 months
Minimum Order Quantity1 set
Supply Chain Partners35
Our Production Capability & Technical Expertise
Main ProductsMvr Evaporators, Multi Effect Evaporators, Forced-Circulation Evaporator, Falling Film Evaporator, Mother Liquor Dehydration, Evaporation Crystallization, Heat Exchanger, Crystallizer, Triple-Effect E
Production Lines1
Production MachinesCutting machine, Rolling machine, Sawing machine, Plate cutting machine, Welding machine
QA/QC inspectors6 people
Inspection Type for Finished Products100% inspection(Visual inspection)
Inspection Method for Finished ProductsHave instructions and uniformly followed
R&D Engineers37 people
Traceability of Raw MaterialsYes
Own BrandYes
Our Industry Experience & Global Business Record
Year of Establishment2015-11-19
Main MarketsDomestic
Repeat Buyers Choice10%~30%
Number of Foreign Trading Staff1
Overseas Agent/BranchNo
New Products Launched in Last yearNo
Our Certifications, Standards & Industry Recognition
Management System CertificationISO9001:2015, ISO45001:2018
Cooperated with Fortune 500No
Product Q&A
Q:What is the warranty period for the MVR evaporator?
A:
We provide a comprehensive 1-year warranty for all our MVR evaporator equipment.
Q:How much energy can be saved compared to multi-effect evaporators?
A:
Our MVR evaporators reduce energy consumption by 30%-50% compared to multiple-effect evaporators by recycling secondary steam.
Q:Can the equipment be customized according to my requirements?
A:
Yes, we offer flexible customization options including minor customization, full customization, customization from designs, and customization from samples.
Q:What is the lead time for production?
A:
The average lead time is 1-3 months, regardless of whether it is peak season or off-season.
Q:What are the available payment terms?
A:
We accept T/T, LC, D/P, PayPal, Western Union, and small-amount payments.
Send Inquiry
*To:
Qingdao Conqinphi Environmental Technology Group Co, . Ltd
Qingdao Conqinphi Environmental Technology Group Co, . Ltd*Content:
Supplier replies will be sent to your registered email
You may also like
Low Temperature Condensing Unit for Freezer Cold Room Outdoor Condenser
US$1,285.00-5,000.00
1 Piece(MOQ)
Condenser Dl Energy Conservation Low Temperature Cold Room Evaporator Condensing Unit Air Cooled
US$209.00-215.00
1 piece(MOQ)
High Performance Temperature Control Units Single with Booster Pumps
US$4,599.00-5,499.00
1 Piece(MOQ)
Strong Durability -40℃ 35HP Indoor Unit with CE Certificate for Chemical Low Temp Room
US$350.00-450.00
1 Piece(MOQ)
Heavy-Duty Air Cooled Refrigeration Unit for Cold Rooms
US$200.00-280.00
1 Piece(MOQ)
Ambient Temperature Vaporizer / Pressurizer / Pressure Build-up Unit for Cryogenic Liquid Tanks
US$2,000.00-20,000.00
1 Set(MOQ)
Minus 40 to 300 Degree Dynamic Temperature Control Air-Cooled Cooling and Heating Unit
US$4,599.00-5,499.00
1 Piece(MOQ)
Efficiency Microprocessor Controlled Die Casting Oil Temperature Control Unit
US$4,599.00-5,499.00
1 Piece(MOQ)
Ambient Temperature Vaporizer / Pressurizer / Pressure Build-up Unit for Cryogenic
US$2,000.00-20,000.00
1 Set(MOQ)
Glycol Type -31℃ 30HP Indoor Unit with CE Certificate for Low Temp Storage
US$350.00-450.00
1 Piece(MOQ)
Airts-Gd Low Maintenance Direct Gas Heating Unit with Heat Recycling
US$2,000.00-3,000.00
1 Piece(MOQ)
Tht Low Maintenance Stainless Steel Plate Heat Exchanger Unit Skid System
US$50,000.00
1 Set(MOQ)
Ambient Temperature Vaporizer / Pressurizer / Pressure Build-up Unit for Cryogenic Tanks
US$2,000.00-20,000.00
1 Set(MOQ)
Energy Saving Heat Exchange Unit for Water Source Heat Pump Systems Y10b
US$50,000.00
1 Set(MOQ)
Advanced Microchannel Cooling Unit for Efficient Temperature Control
US$1.00-1,000.00
1 Piece(MOQ)
High Temperature Resistant Power Plants Industrial Heat Exchanger Unit
US$7,000.00-800,000.00
1 Piece(MOQ)
Premium Condensing Unit for Commercial Refrigeration and Freezers
US$500.00-1,000.00
1 Piece(MOQ)
Variable Frequency Heat for Energy Saving Office with Frequency Conversion Motor Low Power Consumption Plate Heat Exchanger Unit
US$5,000.00-20,000.00
1 Piece(MOQ)



















