Powered by Made-in-China.com
Advanced Evaporation Crystallization System for Sustainable Industrial Water Management
US$500.00-53,700.00
1 Piece
Product specifications
model
Product profile
Customization
AvailableAfter-sales Service
7*24hWarranty
1yearModel NO.
KJH-MVR-1662Certification
ISOApplication
Heater, Cooler, Vaporizer, CondenserPrinciple
Evaporation CrystallizationStyle
Steel TypeMaterial
SteelProduct Name
Mvr Evaporation Crystallization SystemIndustry
Metal Smelting/Metallurgy/Electroplating etcOptional Process
Mee/Vacuum/MvrFeatures
Energy-Efficient and Eco-FriendlySalt Content
Sulfate/Nitrate/Potassium-Sodium SaltSpecification
KJH-MVR-1662Trademark
conqinphiOrigin
Qingdao, ChinaProduction Capacity
500Key features
Energy-Efficient Technology: Utilizes mechanical vapor recompression to reduce energy consumption by 30%-50% compared to multi-effect evaporators.
High Degree of Automation: Features stable operation, compact structure, and easy maintenance with a high level of automation.
Wide Application Scope: Suitable for electroplating, metallurgy, lithium batteries, pharmaceuticals, food processing, and petrochemical industries.
Flexible Customization: Offers flexible, minor, and full customization options based on client designs or samples.
Compact Footprint: Design features a small footprint and rarely requires cooling water, saving space and resources.
Low Operating Costs: Primarily consumes electricity without requiring large amounts of steam, ensuring low long-term costs.
Environmental Friendly: Reduces carbon emissions by eliminating the need for raw steam and improving environmental performance.
Comprehensive After-Sales: Provides 7*24h technical support and a 1-year warranty for all equipment.
Company profile
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 1 year CertifiedNearest Port: Qingdao PortAverage Response Time: ≤3.32h
About Our Factory & Business Background
AddressNo. 81, Fengfei Road, Beiguan Industrial Park, Jiaozhou City, Qingdao, Shandong, China
Plant Area25000 square meters
Number of Employees176
Registered Capital50,000,000 RMB
Terms of PaymentT/T, LC, D/P, PayPal, Western Union, Small-amount payment
International Commercial Terms(Incoterms)EXW, CFR, CIF, FOB
Average Lead TimePeak Season Lead Time: 1-3 months Off Season Lead Time: 1-3 months
Minimum Order Quantity1 set
Supply Chain Partners35
Our Production Capability & Technical Expertise
Main ProductsMvr Evaporators, Multi Effect Evaporators, Forced-Circulation Evaporator, Falling Film Evaporator, Mother Liquor Dehydration, Evaporation Crystallization, Heat Exchanger, Crystallizer, Triple-Effect E
Production Lines1
Production MachinesCutting machine, Rolling machine, Sawing machine, Plate cutting machine, Welding machine
QA/QC inspectors6 people
Inspection Type for Finished Products100% inspection(Visual inspection)
Inspection Method for Finished ProductsHave instructions and uniformly followed
R&D Engineers37 people
Traceability of Raw MaterialsYes
Own BrandYes
Our Industry Experience & Global Business Record
Year of Establishment2015-11-19
Main MarketsDomestic
Repeat Buyers Choice10%~30%
Number of Foreign Trading Staff1
Overseas Agent/BranchNo
New Products Launched in Last yearNo
Our Certifications, Standards & Industry Recognition
Management System CertificationISO9001:2015, ISO45001:2018
Cooperated with Fortune 500No
Product Q&A
Q:What is the warranty period for the equipment?
A:
We provide a 1-year warranty for all our MVR evaporators.
Q:What are the customization options available?
A:
We offer flexible, minor, and full customization, including options based on client designs or samples.
Q:How much energy does the MVR evaporator save?
A:
It reduces energy consumption by 30%-50% compared to multi-effect evaporators by recycling secondary steam.
Q:What is the minimum order quantity?
A:
The minimum order quantity is 1 set.
Q:What is the lead time for production?
A:
The average lead time is 1-3 months for both peak and off-peak seasons.
Send Inquiry
*To:
Qingdao Conqinphi Environmental Technology Group Co, . Ltd
Qingdao Conqinphi Environmental Technology Group Co, . Ltd*Content:
Supplier replies will be sent to your registered email
You may also like
Mvr System for Advanced Water Evaporation and Crystallization Processes
US$500.00-53,700.00
1 Piece(MOQ)
Vacuum Evaporation Zld Water Treatment System for Industrial Wastewater
US$6,600.00-52,700.00
1 Piece(MOQ)
Advanced Water Cooling System for Superior Thermal Management
US$890.00-900.00
1 units(MOQ)
High-Performance Evaporation Crystallization System for Industrial Water Treatment
US$500.00-53,700.00
1 Piece(MOQ)
Mvr Evaporation Crystallization System for Efficient Industrial Water Treatment
US$500.00-53,700.00
1 Piece(MOQ)
Advanced Industrial Water Cooling System for Efficient Distillation
US$5.60-9.30
1 pieces(MOQ)
Advanced Durable Sea Water Cooling System for Boats
US$12.00-88.00
1 Piece(MOQ)
Factory Direct Easy Maintenance Industrial Decarbonization System for Blast Furnaces
US$1,400,000.00-5,000,000.00
1 Piece(MOQ)
Advanced Thermal Management Systems for Efficient Chemical Processing
US$95.00-100.00
1 Piece(MOQ)
Popular Choice Energy Saving Industrial Decarbonization System for Blast Furnaces
US$1,400,000.00-5,000,000.00
1 Piece(MOQ)
Whr Boiler Equipment Energy Saving Industrial Waste Heat Recovery System for Blast Furnaces
US$1,400,000.00-5,000,000.00
1 Piece(MOQ)
Customize Battery Cooling System for EV Car Electric Vehicle Battery
US$300.00-800.00
1 Piece(MOQ)
Hot Sale Wide Adaptation Industrial Decarbonization System for Metallurgy Firms
US$1,400,000.00-5,000,000.00
1 Piece(MOQ)
High Perfomance Battery Liquid Cooling System for Electric Vehicle Cars
US$300.00-800.00
1 Piece(MOQ)
Portable Chiller Unit Mini Liquid Cooling System for Industrial Equipment and Lasers
US$300.00-1,500.00
1 Set(MOQ)
Custom High Perfomance Battery Thermal Management System
US$300.00-800.00
1 Piece(MOQ)
Budget-Friendly Air Compressor Heat Recovery System for African Industrial Projects
US$800.00-20,000.00
1 Piece(MOQ)
Chiller Module Liquid Cooling System Cooling Module for Thermal Management
US$300.00-1,500.00
1 Set(MOQ)
Advanced Customizable Heat Exchange Systems for Optimal Performance
US$128.00-1,780.00
1 Piece(MOQ)
Complete Genset Waste Heat Recovery System for Commercial & Industrial Use
US$800.00-20,000.00
1 Piece(MOQ)



















