SourcingAI
Try for free
Powered by Made-in-China.com
China Supplier Large Capacity 240m3/H Ready Mixed Concrete Mixing Plant
US$600,000.00
1-4 Sets
US$500,000.00
5+ Sets

Product profile

Customization

Available

After-sales Service

Video Technical Support

Warranty

1 Year

Model NO.

HZS240

Type

Concrete Mixing Plant

Shotcrete Type

Dry

Machining Process

Welded Molding Machine

Structure

Rotor Type

Productivity

240m²/h

Feeding Height

1400mm

Vibrating Amplitude

2.6mm

Certification

ISO9001: 2000, CE

Condition

New

Color

Blue

Power

Hydraulic

Water Supply Mode

Water Pump

Feeding Method

Belt Feeding

Core Components

Motor Bearing Gear Pump Gearbox

Cement Silo

Customized

Engine Brand

Mascot

Discharge Way

Reverse Discharge

Theory Productivity

240m3/H

Batching Bin

4 Bins

Operating Mode

Continuous

Concrete State

Flowing Concrete

Customized

Customized

Transport Package

Sea Container

Trademark

Xingye

Origin

China

HS Code

8474310000

Production Capacity

100set/Month

Key features

Space-Saving Top Silo Design: Saves over 30% land occupation and reduces construction costs by eliminating side support frames.
Continuous Feeding System: Built-in waiting hopper enables non-stop mixing and improves working efficiency by 10%.
Dual-Computer Control: Dual PLC system with 4G module supports remote monitoring, fault diagnosis, and multi-language operation.
Fast Installation: Modular prefabricated design allows complete installation within 4-7 days, cutting time by half.
Environmental Compliance: Fully enclosed design with dual dust removal and optional waste recycling ensures zero sewage discharge.
Easy Maintenance Access: Wide multi-layer platforms and access hatches allow blade replacement in 2-3 hours without heavy lifting.

Company profile

CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service AvailableExport Year: 2023-02-13 CertifiedNearest Port: Xiamen PortAverage Response Time: ≤1.42h CertifiedTerms of Payment: LC, T/T, PayPal, etc.

About Our Factory & Business Background

AddressNingdu County Industrial Park, Ganzhou, Jiangxi, China
Plant Area3000 square meters
Number of Employees58
Registered Capital10,000,000 RMB
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: within 15 workdays

Our Production Capability & Technical Expertise

Main ProductsConcrete batching plant
Production MachinesMachining Facility, Welding Facility
R&D Engineers2 people

Our Industry Experience & Global Business Record

Year of Establishment2013-07-25
Main MarketsSouth America, Southeast Asia, Mid East, Eastern Asia
Number of Foreign Trading Staff3
Overseas Agent/BranchNo

Our Certifications, Standards & Industry Recognition

Management System CertificationOthers

Product Q&A

Q:What is the difference between top-mounted HZS240 and conventional side-silo HZS240? How to choose?
A:
Choose the top-mounted model if you have limited land, run an urban commercial mixing station with strict environmental standards and want to save civil construction costs. Conventional side-silo plants are suitable for spacious temporary construction sites requiring frequent relocation.
Q:What is the total installed power of the whole plant? What transformer capacity is required?
A:
Total installed power is about 280kW. A 315kW transformer is recommended to support full-load synchronous operation of production, dust removal and water supply systems.
Q:What environmental accessories can be equipped?
A:
Standard: silo-top dust collectors and main building pulse dust removal. Optional: sand-gravel separator, waste water recycling system, fully enclosed belt gallery, spray dust suppression system, noise insulation room and remote level monitoring system.
Q:Is maintenance inside the main building convenient? How long does it take to replace mixing blades?
A:
Wide multi-layer maintenance platforms and full surrounding access hatches for the mixer. Complete replacement of blades and liners only takes 2-3 hours without large lifting equipment, greatly shortening downtime.
Q:How long is the installation cycle of the top-mounted HZS240 plant?
A:
All modular prefabricated parts. Complete hoisting, wiring and commissioning can be finished within 4-7 days, cutting installation time by half versus traditional mixing plants.

Send Inquiry

*To:Ningdu Xingye Machinery Manufacturing Co., Ltd.Ningdu Xingye Machinery Manufacturing Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

New Advanced Electrical Ready Mixed 120m3 Concrete Mixing Plant
Made-in-China.com