Two-bin Centralized Aggregate Weighing Design
The centralized batching method avoids proportion deviation caused by separate weighing, ensures stable and consistent concrete ratio
Reliable JS750 Twin-shaft Forced Mixing Performance
All raw materials are fully mixed in a short cycle without segregation and dead corners, producing high-quality concrete with stable strength
Stable 35m3/h Standard Production Capacity
It maintains stable output efficiency under long-term working conditions, perfectly matching the concrete demand of small&medium-sized engineering projects
Compact & Space-saving Modular Structure
The two-bin aggregate structure is reasonably arranged with small floor area, suitable for narrow construction sites, suburban projects and limited space
High-precision Automatic Batching & Control
The metering accuracy is high, effectively reducing material waste and ensuring standardized concrete production.
Low Investment & Excellent Cost Performance
It saves labor, site and operating costs, being the preferred equipment for small and medium construction teams.
Durable Configuration & Low Failure Rate
The optimized shaft-end sealing structure effectively prevents mortar leakage, ensures stable long-term operation and reduces maintenance frequency.
Easy Installation & Flexible Transfer
It is easy to disassemble and transport, adapting to temporary engineering and frequently relocated construction projects.