Powered by Made-in-China.com
Drop Fored Scaffolding Board Returning Clamp for Pipe Connecting
US$1.00-2.00
1,000 Pieces
Sample price:US$2.00/piece.Request sample
Product profile
Customization
AvailableAfter-sales Service
1 YearWarranty
1 YearModel NO.
YH004Material
SteelType
FixedStructural Style
Tube and Clamp ScaffoldingFramework
Combined ScaffoldingSupporting Mode
Projecting ScaffoldingLapping Form
Double ScaffoldingErection Position
External ScaffoldingMove Method
Horizontal mobile ScaffoldingScaffolding Part Type
Scaffolding CouplersConstruction Properties
Installation ScaffoldWeight
0.65kgsSurface Finishing
GalvanizedTest Standard
En74bBolt
M14 T BoltNut
21mm Flange NutTransport Package
Cartons Woven Bags Steel PalletsSpecification
48.3mm X 48.3mmTrademark
YAHUA NEXUSOrigin
ChinaHS Code
730890Production Capacity
2000000PCS/YearKey features
Durable Galvanized Finish: Electro galvanizing provides superior corrosion resistance for long-term outdoor use.
Compliance with EN74b Standard: Fully tested and compliant with BS EN 74-1:2005 for scaffolding couplers.
1-Year Warranty Coverage: Includes 1-year warranty and after-sales service for mechanical defects.
Mature Production Lines: Equipped with drop forging, laser cutting, and automatic welding lines.
Free Sample Availability: Free samples are available upon request for quality verification.
Lightweight Design: Weighs only 0.65kgs for easy handling and installation.
Flexible Payment Terms: Accepts T/T and L/C at sight for secure transactions.
Fast Lead Time: Off-season lead time within 15 workdays; peak season within one month.
Company profile
Business Type: Manufacturer/Factory, Group CorporationExport Year: 2004-10-25Nearest Port: Shanghai, Taicang, NanjingAverage Response Time: ≤2.72hTerms of Payment: LC, T/TInternational Commercial Terms(Incoterms): FOB, EXW, CFR, CIF, DDP
About Our Factory & Business Background
Address1010 Wanjiafu Plaza, Tianmushan Street, Jiangyan District, Taizhou, Jiangsu, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: within 15 workdays
Our Production Capability & Technical Expertise
Main ProductsConstruction Temporary Edge Protection Systems, Construction Site Hoarding Systems, Fence Systems, Steel Post Stillages, Storage Cage, Scaffolding Right Angle Couplers, Scaffolding Swivel Couplers, Screw Base Jacks, Welding Accessories
Our Industry Experience & Global Business Record
Main MarketsNorth America, Eastern Europe, Western Europe
Product Q&A
Q:Are you a factory or a trading company?
A:
We are a factory.
Q:Can I get some samples?
A:
Yes, free sample are available upon request.
Q:How can we guarantee quality?
A:
Define quality standards,Develop quality assurance processes,Involve stakeholders,Train employees,Implement quality control measures,Conduct audits,Continuous improvement
Q:Do you have Certificate?
A:
Scaffolding couplers are fully compliant and tested to BS EN 74-1:2005 and site security guardrail systems to BS EN 13374 standard.
Q:How is your technical forces?
A:
We own mature drop forging production line,laser cutting production line and automatic welding production line.
Send Inquiry
*To:
Taizhou Nexus Import and Export Co., Ltd.
Taizhou Nexus Import and Export Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
Drop Fored Scaffolding Double Clamp for Pipe Connecting
US$2.00-3.00
1,000 Pieces(MOQ)
Q235 Steel Drop Fored Scaffolding Half Clamp for Pipe Connecting
US$2.00-3.00
1,000 Pieces(MOQ)
Drop Fored Scaffolding The D/F Double Clamp for Pipe Connecting
US$2.00-2.50
1,000 Pieces(MOQ)
Drop Forged Scaffolding 90 Degree Clamp for Pipe Connecting
US$1.50-2.00
1,000 Pieces(MOQ)
Electro Galvanized Steel Pipe Fitting Scaffolding Drop Forged Girder/Beam Clamp for Construction Tubular Scaffolding
US$0.60-2.50
1,000 Pieces(MOQ)
Scaffolding Pipe Fittings Drop Forged Couplers Pressed Clamp Swivel Clamp for Building Material
US$0.70-2.50
1 Piece(MOQ)
BS1139 Steel Scaffolding Toe Board Clamp for 48.3mm Pipe En74
US$1.96-1.98
1,000 Pieces(MOQ)
Heavy-Duty Drop Forged Scaffolding Board Clamp for Construction
US$0.50-1.00
1,000 Pieces(MOQ)
Easy Scaffold Drop Forged En74 British Pipe Joint/Double/Swivel/Putlog Scaffolding Clamp
US$1.38-1.78
5,000 Pieces(MOQ)
Pipe Scaffolding Clamp Rotating 1 1/2 Inch for Oil and Gas Industry
US$1.00-5.00
3,000 Pieces(MOQ)
Scaffolding BS 1139 Forged Swivel Clamp for 48.3mm Pipe En74
US$1.49-1.99
5,000 Pieces(MOQ)
Japanese Type Pressed Swivel Scaffolding Couplers Swivel Clamps for Pipe
US$0.85
1,000 Pieces(MOQ)
BS1139 Steel Scaffolding Toe Board Swivel Clamp for 48.3mm Pipe En74
US$0.50-1.20
100 Pieces(MOQ)
Rosette Clamp for Ringlock Scaffold Drop Forged Putlog Scaffold Pipe Clamp
US$3.05-3.10
1,000 Pieces(MOQ)



















