Powered by Made-in-China.com
Easy Installing 105 Range C Frame Clamp for Tube and Fittings
US$3.96
800-1,599 Pieces
US$3.94
1,600-3,999 Pieces
US$3.92
4,000-15,999 Pieces
US$3.90
16,000+ Pieces
Sample price:US$5.00/piece.Request sample
Product profile
Customization
AvailableAfter-sales Service
AvailableWarranty
1 YearModel NO.
NX020Material
SteelType
FixedStructural Style
Tube and Clamp ScaffoldingFramework
Combined ScaffoldingSupporting Mode
Projecting ScaffoldingLapping Form
Full ScaffoldingErection Position
External ScaffoldingMove Method
Horizontal mobile ScaffoldingScaffolding Part Type
Scaffolding CouplersConstruction Properties
Installation ScaffoldBody Raw Material
45# SteelBolt Raw Material
40cr SteelProcess
Forging/Heat TreatmentWeight
1.45kgsClamp Range
105mmBolt
M20 X 130mm Hexagonal BoltSurface Finishing
Colour Electro GalvanizingTransport Package
Cartons with Wooden PalletsSpecification
105mmTrademark
NEXUSOrigin
ChinaHS Code
730890Production Capacity
2000000PCS/YearKey features
High-Strength Steel Material: Constructed from 45# Steel body and 40cr Steel bolt for superior durability.
Certified Safety Compliance: Fully compliant and tested to BS EN 74-1:2005 and BS EN 13374 standards.
Professional Manufacturing: Factory direct with mature drop forging, laser cutting, and automatic welding lines.
Green Recyclable Products: Committed to global green transition with recyclable product systems.
1 Year Warranty Coverage: Provides a comprehensive 1-year warranty for peace of mind.
Free Sample Availability: Free samples are available upon request for quality verification.
Flexible Payment Terms: Accepts T/T, L/C at sight, and D/P for convenient transactions.
Efficient Lead Time: Off-season lead time within 15 workdays; peak season one month.
Company profile
Business Type: Manufacturer/Factory, Group CorporationExport Year: 2004-10-25Nearest Port: Shanghai, Taicang, NanjingAverage Response Time: ≤4.30hTerms of Payment: LC, T/TInternational Commercial Terms(Incoterms): FOB, EXW, CFR, CIF, DDP
About Our Factory & Business Background
Address1010 Wanjiafu Plaza, Tianmushan Street, Jiangyan District, Taizhou, Jiangsu, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: within 15 workdays
Our Production Capability & Technical Expertise
Main ProductsConstruction Temporary Edge Protection Systems, Construction Site Hoarding Systems, Fence Systems, Steel Post Stillages, Storage Cage, Scaffolding Right Angle Couplers, Scaffolding Swivel Couplers, Screw Base Jacks, Welding Accessories
Our Industry Experience & Global Business Record
Main MarketsNorth America, Eastern Europe, Western Europe
Product Q&A
Q:Are you a factory or a trading company?
A:
We are a factory.
Q:Can I get some samples?
A:
Yes, free sample are available upon request.
Q:How can we guarantee quality?
A:
Define quality standards, Develop quality assurance processes, Involve stakeholders, Train employees, Implement quality control measures, Conduct audits, Continuous improvement.
Q:Do you have Certificate?
A:
Scaffolding couplers are fully compliant and tested to BS EN 74-1:2005 and site security guardrail systems to BS EN 13374 standard.
Q:How is your technical forces?
A:
We own mature drop forging production line, laser cutting production line and automatic welding production line.
Send Inquiry
*To:
Taizhou Nexus Import and Export Co., Ltd.
Taizhou Nexus Import and Export Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
Galvanized Forging C Frame Clamp with 51mm Clamp Range for Beam Clamp
US$1.22-1.28
2,000 Pieces(MOQ)
JIS Style Electro Galvanizing C Type Clamp for Tube and Fittings
US$0.65-0.95
1,000 Pieces(MOQ)
65mm Open Clamp Range Galvanizing C Frame Clamp for Large Steel Plate
US$3.22-3.28
1,000 Pieces(MOQ)
High Quantityc C Frame Clamp with 51mm Open and 12mm Hook for Scaffolding
US$1.65-1.71
2,000 Pieces(MOQ)
Electro Galvanized Steel Pipe Fitting Scaffolding Drop Forged Girder/Beam Clamp for Construction Tubular Scaffolding
US$0.60-2.50
1,000 Pieces(MOQ)
BS1139 Scaffolding Clamp, Tube and Clamp Scaffold, Pipe Clamp Fittings Scaffolding
US$1.20-2.10
1,000 Pieces(MOQ)
Scaffold Pipe Fitting Accessories Drop Forged Pressed Scaffolding Clamp for Construction Tubular Scaffolding
US$0.60-2.50
1,000 Pieces(MOQ)
Galvanized Steel Pipe Fitting Sleeve Coupler Scaffolding Clamp for Scaffolding Tubular System
US$0.50-1.00
1,000 Pieces(MOQ)
Scaffolding Tube and Fittings fastener Double Couplers Fixed Clamps BS 1139
US$0.90-1.50
100 Pieces(MOQ)
BS1139 Scaffolding Tubes Fittings Materials Parts Cross Swivel Clamp for Scaffolding Tubular
US$1.20-2.10
1,000 Pieces(MOQ)
Steel Mobile Packed by Bags and Pallet BS1139 Clamps Tube Fittings
US$1.00-3.00
500 Pieces(MOQ)
Pressed Steel Scaffold Clamp for Secure and Fast Tube Connection
US$660.00-670.00
5 Tons(MOQ)
Electro-Galvanized Mobile Packed by Bags and Pallet Tube Clamps Steel Fittings
US$1.00-3.00
500 Pieces(MOQ)
Steel Frame Scaffold Expansion Joint Lock Pin Clamp for Scaffolding Tube / Pipe
US$0.57-0.69
100 Pieces(MOQ)
En Building Scaffold Packed by Bags and Pallet Clamps Tube Fittings
US$0.80-1.50
1,000 Pieces(MOQ)
Hot Selling Pressed Steel Scaffold Clamp for Secure and Fast Tube Connection
US$660.00-670.00
5 Tons(MOQ)
Steel Building Scaffold Packed by Bags and Pallet BS Pressed Clamps Tube Fittings
US$0.80-1.50
1,000 Pieces(MOQ)



















