Powered by Made-in-China.com
Factory Direct C Frame Clamp with 51mm for Scaffolding Pipe
US$1.71
2,000-3,999 Pieces
US$1.69
4,000-9,999 Pieces
US$1.67
10,000-33,999 Pieces
US$1.65
34,000+ Pieces
Sample price:US$2.00/piece.Request sample
Product profile
Customization
AvailableAfter-sales Service
AvailableWarranty
1 YearModel NO.
NX016Material
SteelType
FixedStructural Style
Tube and Clamp ScaffoldingFramework
Combined ScaffoldingSupporting Mode
Projecting ScaffoldingLapping Form
Full ScaffoldingErection Position
External ScaffoldingMove Method
Horizontal mobile ScaffoldingScaffolding Part Type
Scaffolding CouplersConstruction Properties
Installation ScaffoldBody Raw Material
45# SteelBolt Raw Material
40cr SteelProcess
Forging/Heat Treatment/WeldingWeight
0.78kgsClamp Range
51mmBolt
M12 X 70mm Hexagonal BoltHook Dia.
12mmHook Space
16mmSurface Finishing
Colour Electro GalvanizingTransport Package
Woven Bags with Wooden PalletsSpecification
51mmTrademark
NEXUSOrigin
ChinaHS Code
730890Production Capacity
2000000PCS/YearKey features
Factory Direct Supply: Direct manufacturing from NEXUS Metalwork in Taizhou, China.
High-Strength Material: Constructed from 45# Steel body and 40cr Steel bolts for durability.
Precision Fit: Specifically designed for 51mm scaffolding pipes with M12 bolts.
Corrosion Protection: Features colour electro galvanizing for long-lasting surface finish.
Certified Quality: Compliant with BS EN 74-1:2005 and BS EN 13374 standards.
One-Year Warranty: Includes 1-year warranty coverage for product defects.
Free Samples: Free samples available upon request for quality verification.
Flexible Payment: Accepts T/T, L/C at sight, and D/P payment terms.
Company profile
Business Type: Manufacturer/Factory, Group CorporationExport Year: 2004-10-25Nearest Port: Shanghai, Taicang, NanjingAverage Response Time: ≤2.78hTerms of Payment: LC, T/TInternational Commercial Terms(Incoterms): FOB, EXW, CFR, CIF, DDP
About Our Factory & Business Background
Address1010 Wanjiafu Plaza, Tianmushan Street, Jiangyan District, Taizhou, Jiangsu, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: within 15 workdays
Our Production Capability & Technical Expertise
Main ProductsConstruction Temporary Edge Protection Systems, Construction Site Hoarding Systems, Fence Systems, Steel Post Stillages, Storage Cage, Scaffolding Right Angle Couplers, Scaffolding Swivel Couplers, Screw Base Jacks, Welding Accessories
Our Industry Experience & Global Business Record
Main MarketsNorth America, Eastern Europe, Western Europe
Product Q&A
Q:Are you a factory or a trading company?
A:
We are a factory.
Q:Can I get some samples?
A:
Yes, free sample are available upon request.
Q:How can we guarantee quality?
A:
Define quality standards, Develop quality assurance processes, Involve stakeholders, Train employees, Implement quality control measures, Conduct audits, Continuous improvement.
Q:Do you have Certificate?
A:
Scaffolding couplers are fully compliant and tested to BS EN 74-1:2005 and site security guardrail systems to BS EN 13374 standard.
Q:How is your technical forces?
A:
We own mature drop forging production line, laser cutting production line and automatic welding production line.
Send Inquiry
*To:
Taizhou Nexus Import and Export Co., Ltd.
Taizhou Nexus Import and Export Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
Open 105mm Large C Frame Clamp for Plate with Galvanized for Sale
US$3.90-3.96
800 Pieces(MOQ)
Yellow Galvanized C Frame Clamp with 12mm Diameter Hook for Construction
US$1.65-1.71
2,000 Pieces(MOQ)
Self Black Scaffolding C Type Clamp Frame with 38mm Open for Scaffolding
US$0.80-0.86
3,000 Pieces(MOQ)
JIS Type C Frame Clamp with 51mm Clamp Range for Scaffolding Accessories
US$1.22-1.28
2,000 Pieces(MOQ)
Factory Direct Hot Sale Heavy Duty Q235 Steel Silver Scaffolding Swivel Clamp for Construction
US$0.782
2,750 Pieces(MOQ)
Factory Direct Sale Scaffolding Steel Pipe Galvanized Double Coupler Swivel Clamp for Constuction
US$0.80-2.50
100 Pieces(MOQ)
Steel Frame Scaffold Expansion Joint Lock Pin Clamp for Scaffolding Tube / Pipe
US$0.57-0.69
100 Pieces(MOQ)
En74/BS1139 Galvanized Steel Pipe Fitting Scaffolding System Hardware Scaffold Clamps for Construction
US$0.60-2.50
1,000 Pieces(MOQ)
Factory Direct Supply Quality Assured Forged Swivel Pipe Clamp Scaffolding Tube Clamp
US$2.33-2.34
1,000 Pieces(MOQ)
Bythai Factory Hot Sales Fixed Right Angle Forged Scaffolding Clamps Scaffold Clamp for Pipe Bolt Scaffold
US$0.60-1.20
1,000 Pieces(MOQ)
Factory Hot Sales Fixed Right Angle Forged Scaffolding Clamps Scaffold Clamp for Pipe Bolt Scaffold
US$0.60-1.20
1,000 Pieces(MOQ)
Versatile Scaffolding Clamp Designed for Galvanized Pipe Use
US$0.10-0.50
1,000 Pieces(MOQ)
Premium Scaffolding Clamp for Galvanized Pipe Fencing Solutions
US$0.10-0.50
1,000 Pieces(MOQ)
Easy Scaffolding British Ddrop Forged Pressed Pipe Swivel Putlog Clamp for 48mm Pipe
US$1.23-1.56
2,000 Pieces(MOQ)
Drop Forged T Bolt with Nut and Washer for Scaffolding Clamp &Coupler
US$0.75-2.00
2,000 Pieces(MOQ)
Scaffolding Steel Pipe Fitting Pressed Coupler Pressed Clamp Swivel Clamp with BS Standard
US$0.70-2.50
1 Piece(MOQ)
Scaffolding Pressed Galvanized Pressed Fencing Clamp for Pipe
US$0.10-0.50
1,000 Pieces(MOQ)



















