Powered by Made-in-China.com
HDG Scaffolding C Type Frame Clamp with 38mm Open for Scaffolding
US$1.08
2,400-4,799 Pieces
US$1.06
4,800-11,999 Pieces
US$1.04
12,000-47,999 Pieces
US$1.02
48,000+ Pieces
Sample price:US$2.00/piece.Request sample
Product profile
Customization
AvailableAfter-sales Service
AvailableWarranty
1 YearModel NO.
NX019Material
SteelType
FixedStructural Style
Tube and Clamp ScaffoldingFramework
Combined ScaffoldingSupporting Mode
Projecting ScaffoldingLapping Form
Full ScaffoldingErection Position
External ScaffoldingMove Method
Horizontal mobile ScaffoldingScaffolding Part Type
Scaffolding CouplersConstruction Properties
Installation ScaffoldBody Raw Material
45# SteelBolt Raw Material
40cr SteelProcess
Forging/Heat TreatmentWeight
0.48kgsClamp Range
38mmBolt
M12 X 65mm Hexagonal BoltSurface Finishing
Hot DIP GalvanizingTransport Package
Cartons with Wooden PalletsSpecification
38mmTrademark
NEXUSOrigin
ChinaHS Code
730890Production Capacity
2000000PCS/YearKey features
Hot Dip Galvanizing Finish: Provides superior corrosion resistance for long-term outdoor durability.
High-Strength Steel Material: Constructed from 45# Steel body and 40cr Steel bolts for maximum load capacity.
Precision 38mm Clamp Range: Designed specifically for scaffolding tubes with a 38mm open range.
Forging and Heat Treatment: Manufactured using mature drop forging and heat treatment processes.
BS EN 74-1:2005 Compliance: Fully compliant and tested to BS EN 74-1:2005 standards for safety.
1-Year Warranty Coverage: Includes a comprehensive 1-year warranty for peace of mind.
Free Sample Availability: Free samples are available upon request for quality verification.
Direct Factory Supply: Manufactured directly by NEXUS Metalwork with mature production lines.
Company profile
Business Type: Manufacturer/Factory, Group CorporationExport Year: 2004-10-25Nearest Port: Shanghai, Taicang, NanjingAverage Response Time: ≤4.49hTerms of Payment: LC, T/TInternational Commercial Terms(Incoterms): FOB, EXW, CFR, CIF, DDP
About Our Factory & Business Background
Address1010 Wanjiafu Plaza, Tianmushan Street, Jiangyan District, Taizhou, Jiangsu, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: within 15 workdays
Our Production Capability & Technical Expertise
Main ProductsConstruction Temporary Edge Protection Systems, Construction Site Hoarding Systems, Fence Systems, Steel Post Stillages, Storage Cage, Scaffolding Right Angle Couplers, Scaffolding Swivel Couplers, Screw Base Jacks, Welding Accessories
Our Industry Experience & Global Business Record
Main MarketsNorth America, Eastern Europe, Western Europe
Product Q&A
Q:Are you a factory or a trading company?
A:
We are a factory.
Q:Can I get some samples?
A:
Yes, free sample are available upon request.
Q:How can we guarantee quality?
A:
Define quality standards, Develop quality assurance processes, Involve stakeholders, Train employees, Implement quality control measures, Conduct audits, Continuous improvement.
Q:Do you have Certificate?
A:
Scaffolding couplers are fully compliant and tested to BS EN 74-1:2005 and site security guardrail systems to BS EN 13374 standard.
Q:How is your technical forces?
A:
We own mature drop forging production line, laser cutting production line and automatic welding production line.
Send Inquiry
*To:
Taizhou Nexus Import and Export Co., Ltd.
Taizhou Nexus Import and Export Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
JIS Style Scaffolding C Type Clamp with 38mm Open for Building Work
US$0.90-0.96
3,000 Pieces(MOQ)
Building Construction JIS Style Scaffolding C Type Clamp with 38mm Open
US$0.90-0.96
3,000 Pieces(MOQ)
German Type Forged Spigot Adapter Clamp with Half Coupler for System Scaffolding
US$2.73-3.03
100 Pieces(MOQ)
Factory Direct C Frame Clamp with 51mm for Scaffolding Pipe
US$1.65-1.71
2,000 Pieces(MOQ)
SGS Certificate C Frame Clamp for Beam Clamp Connecting with 48.6mm Coupler
US$1.22-1.28
2,000 Pieces(MOQ)
Zinc Pressed Small R&L Frame Scaffolding Lock Clamp for Korea
US$0.90-1.20
100 Pieces(MOQ)
HDG/Electro-Galv. Drop Forged British/German/American Type Scaffolding Clamp for Construction
US$0.50-1.50
1 Piece(MOQ)
Steel Frame Scaffold Expansion Joint Lock Pin Clamp for Scaffolding Tube / Pipe
US$0.57-0.69
100 Pieces(MOQ)
Frame Scaffolding Pipe Hook Pressed Support Clamp
US$0.40-0.75
100 Pieces(MOQ)
Scaffolding System Accessory Swivel Clamp with Forged Steel Construction for Tube Connection
US$0.782
2,750 Pieces(MOQ)
Frame Scaffolding Lock Clamp Pipe Clamp for Scaffold
US$0.90-1.20
100 Pieces(MOQ)
Japanese Type Pressed Swivel Scaffolding Couplers Swivel Clamps for Pipe
US$0.85
1,000 Pieces(MOQ)
5/8'' 3/4'' Heavy Duty Galvanized Scaffolding Coupler C Type Clamp for Pipe
US$0.80-1.20
1,000 Pieces(MOQ)
En74 Steel Scaffolding Swivel Couplers Wedge Clamp with HDG Surface Treatment
US$3.28-3.60
100 Pieces(MOQ)
American Type Scafolding Right Angle Clamp (FF-0005) Scaffolding for Building Construction
US$1.30-1.49
1,000 Pieces(MOQ)



















