SourcingAI
Try for free
Powered by Made-in-China.com
Sheet Metal Bending Laser Cutting Fabrication Powder Coat Bracket Material Customized SPCC/SGCC/SPHC
US$2.00
100 Pieces

Product profile

Customization

Available

Type

Cold Stamping

Processing Type

Shaping Metal

Material

Carbon Steel

Mould

Simple Single Process Dies

Surface Processing

Spraying

Fine Blanking

Multi-Position

Process

Forming Process

Industry

Metal Stamping Parts

Tolerances

0.02mm

Customized

Customized

Name

Iron Hinge Stamping Part of Factory Supplier

Size

Customized

Work

Stamping

Surface Finish

Black Powder Coating

Delivery Time

30 Days

Transport Package

Safety Export Package

Specification

SGS

Trademark

ACE

Origin

Ningbo

HS Code

7307990000

Production Capacity

Stamping Part: 50000PCS/Month

Key features

Customized Dimensions: Size is fully customizable to meet specific project requirements.
Wide Material Selection: Supports SPCC, SGCC, Stainless Steel, Carbon Steel, Aluminum, and alloys.
Fast Quotation: Receive detailed quotation within 24 hours of inquiry submission.
Low MOQ: Flexible minimum order quantity to accommodate various business needs.
Free Samples: Free samples available for select items to ensure quality before bulk order.
High Precision: Tolerances as tight as 0.02mm for precision metal stamping parts.
Multiple Surface Finishes: Options include powder coating, plating, galvanization, and plastic painting.
Comprehensive Processing: Services include laser cutting, bending, punching, welding, and stamping.

Company profile

Ningbo ACE BEST Machinery Co., Ltd.
High Repeat Buyers ChoiceExperienced TeamExhibition ExperienceImporters and Exporters
Business Type: Manufacturer/Factory, Trading CompanyExport Year: 2009-04-01Nearest Port: Ningbo, shanghaiAverage Response Time: ≤18hTerms of Payment: LC, T/T, Small-amount paymentInternational Commercial Terms(Incoterms): FOB, CFR, CIF, EXW

About Our Factory & Business Background

AddressNo.1 Tianlongshan Road, Daqi Industrial Zone, Beilun District, Ningbo, Zhejiang, China
Average Lead TimePeak Season Lead Time: 1-3 months Off Season Lead Time: one month

Our Production Capability & Technical Expertise

Main ProductsMachining Part, Turning Part, Milling Part, Machine Part, Machined Part, Machinery Part, Auto Part, Precision Die Casting, Aluminum Machining, Sheet Metal

Our Industry Experience & Global Business Record

Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe

Product Q&A

Q:What materials are available for this bracket?
A:
We offer SPCC, SGCC, Stainless Steel, Carbon Steel, Mild Steel, Aluminum, and Aluminum alloy.
Q:What is the lead time for production?
A:
The standard delivery time is 30 days. During peak season, it may take 1-3 months, while off-season is about one month.
Q:Can the size of the part be customized?
A:
Yes, the size is fully customized to meet your specific design requirements.
Q:What surface finishes are supported?
A:
We provide powder coating, electrical plating, galvanization, and plastic painting.
Q:What is the tolerance precision?
A:
Our manufacturing process achieves a high precision tolerance of 0.02mm.

Send Inquiry

*To:Ningbo ACE BEST Machinery Co., Ltd.Ningbo ACE BEST Machinery Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like