SourcingAI
Try for free
Powered by Made-in-China.com
Tap-changer is Suitable for Single-phase Oil-immersed Power Transformers with Frequency of 60HZ
US$5.00-20.00
50 Pieces
Sample price:US$10.00/piece.Request sample

Product profile

Customization

Available

Application

Power, Electronic, Instrument

Phase

Three

Model NO.

tap changer

Core

Core-type Transformer

Cooling Method

Dry-type Transformer

Winding Type

Two-winding Transformer

Certification

ISO9001-2000, ISO9001, CCC

Usage

Single-phase Transformer, Power Transformer, Distribution Transformer

Frequency Characteristics

Power Frequency

Brand

NJREC

Rated Voltage

36KV

Rated Current

30A 63A

Length

530mm

Height

70mm 100mm 120mm 130mm 150mm 170mm 200mm

Transport Package

Wooden Box

Trademark

NJREC

Origin

Jiangsu, China

Production Capacity

20000pieces/Year

Key features

Fastest Delivery Time: Delivery can be completed within 10 days for urgent orders.
Off-Season Lead Time: Standard production time is within 15 workdays during off-peak seasons.
Peak Season Lead Time: Production lead time is approximately one month during peak seasons.
Wide Payment Options: Accepts LC, T/T, PayPal, Western Union, and small-amount payments.
Global Shipping Terms: Supports FOB, CFR, CIF, DDP, DAP, FCA, and EXW international terms.
Established Manufacturer: Company established in 2002 with over 20 years of industry experience.
Multiple Port Options: Exports via Shanghai, Nanjing, and Ningbo ports in China.
Comprehensive Product Line: Manufacturer of bushings, insulators, and tap changers for power systems.

Company profile

Business Type: Manufacturer/Factory, Trading Company, Group CorporationExport Year: 2002-02-10Nearest Port: Shanghai Port, China, Nanjing Port, China, Ningbo Port, ChinaAverage Response Time: ≤1.85hTerms of Payment: LC, T/T, PayPal, etc.International Commercial Terms(Incoterms): FOB, CFR, CIF, DDP, DAP, FCA, EXW

About Our Factory & Business Background

AddressNo. 396 Heyan Road, Nanjing, Jiangsu, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: within 15 workdays

Our Production Capability & Technical Expertise

Main ProductsTransformer Bushing, Porcelain Insulator, Composite Insulator, Condenser Bushing, Glass Insulator, Insulation Materials, Wall Bushing, Porcelain Bushing, Tap Changer

Our Industry Experience & Global Business Record

Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe

Product Q&A

Q:What is the fastest delivery time?
A:
The fastest delivery time is 10 days.
Q:What is the lead time during peak season?
A:
The lead time during peak season is one month.
Q:What is the lead time during off season?
A:
The lead time during off season is within 15 workdays.
Q:What payment terms are accepted?
A:
We accept LC, T/T, PayPal, Western Union, and small-amount payment.
Q:Which Incoterms do you support?
A:
We support FOB, CFR, CIF, DDP, DAP, FCA, and EXW.

Send Inquiry

*To:Nanjing Rainbow Electric Co., Ltd.Nanjing Rainbow Electric Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Reliable Double Break Vacuum Tap Changer for Transformers
Made-in-China.com
Wsg Type C off-Circuit Tap Changer for Transformers Switch
Made-in-China.com
Transformer Demagnetized Strip Switch Tap Changer
Made-in-China.com
Transformer on Load Tap Changer Oltc Sf6 Gas Insulation
Made-in-China.com
150A on-Load Tap Changer for Transformer

150A on-Load Tap Changer for Transformer

US$400.00-2,700.00
1 Piece(MOQ)
Made-in-China.com
High Performance Oltc Tap Changers for Power Transformers (7)
Made-in-China.com
Double Break Vacuum on Load Tap Changer for Transformers
Made-in-China.com