SourcingAI
Try for free
Powered by Made-in-China.com
Two Way Shuttle Automatic Rack for Fast Load and Unload
US$800.00
1 Ton
Sample price:US$20.00/piece.Request sample

Product profile

Customization

Available

After-sales Service

Lifetime

Warranty

12 Months

Usage

Tool Rack, Beverage, Tools, Supermarket, Food, Industrial, Warehouse Rack

Material

Steel

Structure

Rack

Mobility

Fixed

Height

5-15m

Closed

Open

Development

New Type

Serviceability

Common Use

Used Scene

Package on Pallet

Load/ Unload

Forklift + Shuttle

Post Size

80/90/100/120

Beams Size

50*50, 60*40, 80*50

Rail Thickness

2.0/2.5/3.0

Rail Height

According to The Shuttle Requirement

Transport Package

Export Package

Trademark

WLB

Origin

China

HS Code

7308900000

Production Capacity

1000sets / Year

Key features

High-Density Storage: Increases storage capacity by up to 50% compared to traditional setups by minimizing aisle width.
Automated Efficiency: Radio-controlled shuttle vehicles accelerate pallet transport, significantly boosting warehouse throughput.
Flexible Inventory: Supports both FIFO and LIFO strategies, ideal for perishable goods and high-volume non-perishables.
Enhanced Safety: Reduces manual forklift risks in confined aisles, protecting personnel from falling items or collapses.
Scalable Design: Modular structure allows seamless integration of additional bays and shuttles as storage demands grow.
Customizable Configuration: Rack dimensions, rail thickness, and post sizes can be tailored to specific facility requirements.
Versatile Shuttle Options: Available in single-level for rapid SKU access or multi-level for vertical agility in tall facilities.
Lifetime Warranty: Comprehensive after-sales service includes lifetime support and a 12-month product warranty.

Company profile

Importers and ExportersHigh Repeat Buyers Choice
Business Type: Manufacturer/FactoryExport Year: 2006-04-03Nearest Port: SHANGHAI PORTAverage Response Time: ≤6.62hTerms of Payment: LC, T/TInternational Commercial Terms(Incoterms): FOB, EXW, CIF, FCA

About Our Factory & Business Background

AddressBuilding 1, No 59 Tianyuan West Road, Jiangning, Nanjing, Jiangsu, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: within 15 workdays

Our Production Capability & Technical Expertise

Main ProductsStorage Rack, Storage Shelving, Automated Racking, Steel Pallet, Steel Mezzanine, Steel Fence, Mesh Decking, Shuttle, Conveyor Line, Racking Components

Our Industry Experience & Global Business Record

Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe

Product Q&A

Q:What is the warranty period?
A:
We provide a 12-month warranty for the product and lifetime after-sales service.
Q:What inventory strategies are supported?
A:
The system supports both FIFO (First-In-First-Out) for perishable goods and LIFO (Last-In-First-Out) for high-volume non-perishables.
Q:How much storage capacity can be increased?
A:
Shuttle racks can increase storage capacity by up to 50% compared to traditional forklift systems by minimizing aisle width.
Q:Can the rack dimensions be customized?
A:
Yes, configurations such as post size, beam size, and rail thickness can be customized to fit specific facility requirements.
Q:What are the lead times for production?
A:
Peak season lead time is one month, while off-season lead time is within 15 workdays.

Send Inquiry

*To:Nanjing Valuable Storage Equipment Co., Ltd
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like