SourcingAI
Try for free
Powered by Made-in-China.com
Double Shaft Extension Mounted Encoder Three Phase Asynchronous Electrical Motor for Closed Loop Speed Control on Precision Slitting Rewinders
US$359.93-28,503.64
1 Piece

Product profile

Customization

Available

Application

Industrial

Speed

High Speed

Model NO.

IE3

Number of Stator

Three-Phase

Function

Driving, Control

Casing Protection

Protection Type

Number of Poles

2

Starting Mode

Direct on-line Starting

Certification

ISO9001, CCC

Brand

Siemens

Rated Output

0.55 ~ 400 Kw

Frame Size

80 ~ 355

Voltage and Frequency

220/380V 50Hz-380/660V 50Hz-Voltage Optional

Standard Color

Stone Grey(Ral7030)

Cooling Method

IC411

Frame-Proof Marking

Ex dB Iic T4 GB

Protect Degree

IP55 IP56 IP65

Insulation Class

F

Ambient Temperature

-20 ~ +60

Transport Package

Wooden Box Board & Cardboard Box

Specification

Customized to size

Trademark

Innomotics

Origin

China

HS Code

8501530090

Production Capacity

500000

Key features

IE3 Energy Efficiency: GB1 Efficiency certified for 15% to 30% energy savings.
Explosion-Proof Certified: ATEX/Ex d IIC T4 certified for safe operation in hazardous environments.
High Reliability: 30% extended lifespan and 40% reduced failure rate.
IP55 Protection: Full series features IP55 protection against dust and water.
Customizable Voltage: Voltage options include 220/380V and 380/660V at 50Hz.
Global Delivery: Zero-damage global delivery with custom shockproof wooden crates.
OEM/ODM Services: We provide OEM and ODM services for branded motors and components.
Long-Term Support: Pre-sale, in-sale, and after-sale services with a customer-first principle.

Company profile

Nantong Kino Automation & Technology Co., Ltd.
Importers and ExportersFast DeliveryR&D CapabilitiesQuality Assurance
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc.Export Year: 2018-01-31Nearest Port: ShanghaiAverage Response Time: ≤1.42h

About Our Factory & Business Background

AddressRoom 101, No.22 Building Shuangyi Pioneer Park, Nantong, Jiangsu, China
Plant Area760.6 square meters
Registered Capital10,000,000 RMB
Terms of PaymentT/T, PayPal
International Commercial Terms(Incoterms)FOB, EXW, CIF, DDP, DAP, CIP
Average Lead TimePeak Season Lead Time: 3-6 months Off Season Lead Time: 3-6 months
Minimum Order Quantity1
Supply Chain Partners5

Our Production Capability & Technical Expertise

Main ProductsElectric Motor, Frequency Changer, AC Motor, Electrical Switchgear Set, Gear Motor, Explosion-Proof Machine, Dust-Proof Machine, Cleaning Machine, Three-Phase Motor, Alternating Current Motor
Production Lines2
Production MachinesUltra-quiet terminal machine, Cutting machine, Drilling machine, Oil pump, Press brakes, Punching machine, Cssemble
QA/QC inspectors1 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsFinished product checked by packing staff
R&D Engineers2 people
Traceability of Raw MaterialsYes

Our Industry Experience & Global Business Record

Year of Establishment2019-01-16
Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe
Repeat Buyers Choice50%~80%
Overseas Agent/BranchNo
New Products Launched in Last yearYes

Product Q&A

Q:Are you a factory or trading company?
A:
KINO is a factory that has been focusing on motors and accessories for more than 12 years.
Q:What about the warranty?
A:
We offer 12 month warranty period as the quality guarantee.
Q:How about your service?
A:
We have pre-sale service, in-sale service and after-sale service. What we pursue is long-term cooperation, so our principle is customer first.
Q:What are your terms of delivery?
A:
Generally we ship in FOB term, but we could offer the solution for CIF and EXW, which all based on your requirement. The door to door service is available.
Q:What's the delivery time?
A:
20 to 30 days after receiving your payment in advance.

Send Inquiry

*To:Nantong Kino Automation & Technology Co., Ltd.Nantong Kino Automation & Technology Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like