SourcingAI
Try for free
Powered by Made-in-China.com
High Starting Torque Squirrel Cage Rotor Three Phase Asynchronous Electrical Motor for Refrigerated Container Cold Room Condenser Fans
US$121.19-12,327.29
1 Piece

Product profile

Customization

Available

Application

Industrial

Speed

High Speed

Model NO.

IE4

Number of Stator

Three-Phase

Function

Driving, Control

Casing Protection

Protection Type

Number of Poles

4

Starting Mode

Direct on-line Starting

Certification

ISO9001, CCC

Brand

Weg

Rated Output

0.55 ~ 200 Kw

Frame Size

80 ~ 315

Voltage and Frequency

Support Multiple Voltage and Frequency

Cooling Method

IC411

Frame-Proof Marking

Ex Tb Iiic T130℃ Db

Protect Degree

IP55

Insulation Class

F

Re-Greasing Device

Fs280 and Above Motor as Standard

Site Altitude Above See Level

Not Exceed 1000m

Transport Package

Wooden Box Board & Cardboard Box

Specification

Customized to size

Trademark

Innomotics

Origin

China

HS Code

8501530090

Production Capacity

500000

Key features

IE3 Energy Efficiency: GB1 Efficiency standard with 15% to 30% energy savings for cost reduction.
Explosion-Proof Certified: ATEX/Ex d IIC T4 certified for safe operation in hazardous environments.
Extended Lifespan: 30% longer service life and 40% reduced failure rate for reliability.
IP55 Protection: Full series features IP55 protection against dust and water ingress.
High Starting Torque: Squirrel cage rotor design ensures high starting torque for heavy loads.
Global Delivery Ready: Plug-and-play ready with shockproof and anti-corrosion packaging.

Company profile

Nantong Kino Automation & Technology Co., Ltd.
Importers and ExportersFast DeliveryR&D CapabilitiesQuality Assurance
Business Type: Manufacturer/FactoryExport Year: 2018-01-31Nearest Port: ShanghaiAverage Response Time: ≤2.52hTerms of Payment: T/T, PayPalInternational Commercial Terms(Incoterms): FOB, EXW, CIF, DDP, DAP, CIP

About Our Factory & Business Background

AddressRoom 101, No.22 Building Shuangyi Pioneer Park, Nantong, Jiangsu, China
Average Lead TimePeak Season Lead Time: 3-6 months Off Season Lead Time: 3-6 months

Our Production Capability & Technical Expertise

Main ProductsElectric Motor, Frequency Changer, AC Motor, Electrical Switchgear Set, Gear Motor, Explosion-Proof Machine, Dust-Proof Machine, Cleaning Machine, Three-Phase Motor, Alternating Current Motor

Our Industry Experience & Global Business Record

Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe

Product Q&A

Q:Are you a factory or trading company?
A:
KINO is a factory that has been focusing on motors and accessories for more than 12 years.
Q:What is the warranty period?
A:
We offer 12 month warranty period as the quality guarantee.
Q:What services do you provide?
A:
We have pre-sale service, in-sale service and after-sale service. Our principle is customer first for long-term cooperation.
Q:What are your terms of delivery?
A:
Generally we ship in FOB term, but we could offer the solution for CIF and EXW, which all based on your requirement. The door to door service is available.
Q:What is the delivery time?
A:
20 to 30 days after receiving your payment in advance.

Send Inquiry

*To:Nantong Kino Automation & Technology Co., Ltd.Nantong Kino Automation & Technology Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like