SummaryThe supplier specializes in professional technical services and 3D software design, with a strong emphasis on customization, particularly in design services. Despite the lack of SDK availability, the supplier displays innovation through its diverse product offerings, such as electric and hydrostatic models. Export activities account for a significant portion of their sales, although they lack overseas warehousing and showrooms. Production capabilities are limited, with only one production line and no standard procedures for outsourcing. Financial data is provided, but specific certifications or customer cases are not detailed. Quality assurance processes are in place, though documentation on service assessment and complaint handling is lacking.
Supplier typeThe supplier is a professional technical provider with capabilities in 3D software design and a high export rate of 90%.
R&D capabilityThe supplier emphasizes innovation with pollution-free and low-noise models, though lacks SDK availability.
Production capacityLimited production capability with only one production line and no ongoing volume reconciliation or outsourcing SOPs.
Customization capabilityExtensive customization options are available, including full and flexible customization from designs and samples.
Product Q&A
Q:What engine options are available for this road roller?
A:
We offer multiple engine options including Changchai 390, Honda GX690, Bresson 3864, and D1105, with emission standards ranging from China II to Euro V and EPA compliance.
Q:What is the maximum speed and climbing ability of the machine?
A:
The machine has a maximum speed of 12km/h and can handle slopes up to 30% gradeability.
Q:How does the hydraulic system improve operation?
A:
The full hydraulic dual-wheel drive and hydraulic steering system ensure smooth, precise movement and flexible operation in narrow sites.
Q:What is the compaction force and vibration frequency?
A:
It features a 40kN excitation force and a vibration frequency of 70Hz for effective compaction.
Q:What are the lead times for production?
A:
During peak season, the lead time is 1-3 months, while during the off-season, it is within 15 workdays.
Send Inquiry
*To:Qingdao New Thrive Power Tech Co., Ltd
*Content:
0/4000
Supplier replies will be sent to your registered email