SourcingAI
Try for free
Powered by Made-in-China.com
High Efficiency Top Outlet Industrial Evaporative Cooler with LCD Controller Cy-Wsa-02t
US$350.00-700.00
1 Piece
Sample price:US$700.00/piece.Request sample

Product profile

Customization

Available

Timer

With Timer

Remote Control

LCD Screen with Remote Control / Manual Controller

Model NO.

CY-WSC-02T/CY-WSC-M02T/CY-WSC-02 /CY-WSC-M02S

Watertank Capacity

36L / 110L

Noise Level

Low

Mounting

Wall / Window Mount / Floor Standing / Portable

Application

Commercial, Industrial

Type

Evaporative Air Cooler

Fan Type

Centrifugal

Operating Voltage

220V

Frequency

50/60Hz

Power

200W

Airflow

8000 M³/H

Cooling Area

60 - 80 M²

Material

High Strength PP Plastic

Certification

CE, ISO9001

Transport Package

Carton Box with Wooden Pallet

Specification

0.7x0.7x0.8m / 0.7x0.7x1.2m

Origin

Jiangsu, China

Production Capacity

500pieces/Month

Key features

Delivers stronger pressure and longer airflow, covering 60-80 m2 effectively.
Saves over 80% electricity compared to traditional air conditioners.
555x555 mm top outlet designed for duct connection and roof mounting.
0.8m height and 34 kg body, saving valuable floor space.
Large capacity reduces refilling and supports long continuous operation.
Rugged enclosure built for outdoor wall mounting and industrial sites.
Large tank and wheels offer flexible cooling for warehouses and events.

Company profile

Nantong Saler Electric Co., Ltd.
Fast DeliveryEnvironmental ProtectionQA/QC Inspectors
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 1 year CertifiedNearest Port: Shanghai PortAverage Response Time: ≤1.28h

About Our Factory & Business Background

AddressBuilding 9, No. 56 Jiangbin Road, Binhai Industrial Park, Qidong City, Nantong, Jiangsu, China
Plant Area2700 square meters
Number of Employees17
Registered Capital1,000,000 RMB
Terms of PaymentLC, T/T, D/P, PayPal, Western Union, Small-amount payment
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: within 15 workdays Off Season Lead Time: within 15 workdays
Minimum Order Quantity100 Sets
Supply Chain Partners12

Our Production Capability & Technical Expertise

Main ProductsEpoxy Resin Insulating Parts
Production Lines1
Production MachinesMixing Machine, Injection Molding Machine, Drying Machine
QA/QC inspectors1 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsHave instructions and uniformly followed
R&D Engineers1 people
Traceability of Raw MaterialsYes

Our Industry Experience & Global Business Record

Year of Establishment2024-10-18
Main MarketsDomestic
Repeat Buyers Choice80%~100%
Number of Foreign Trading Staff2
Overseas Agent/BranchNo
New Products Launched in Last yearNo

Our Certifications, Standards & Industry Recognition

Cooperated with Fortune 500No

Product Q&A

Q:Do your high-voltage components comply with international standards like IEC?
A:
Yes, all our products, including earthing switches and disconnectors, are designed and manufactured in strict accordance with IEC 62271 and GB standards. We conduct rigorous routine tests (insulation, resistance, and mechanical operation) on every unit before shipment to ensure maximum reliability and safety in your power system.
Q:Can you provide customized products based on our technical drawings?
A:
Absolutely. We have a professional technical team that supports OEM and ODM services. Whether you need specific phase-to-phase distances, customized terminal connectors, or additional auxiliary switches and sensors, we can modify our designs to meet your specific switchgear requirements.
Q:Do you provide installation guidance or technical documentation?
A:
Yes, we provide comprehensive technical support for all our clients. Each shipment includes detailed installation manuals, technical drawings, and test reports. If you encounter any challenges during site installation or commissioning, our engineers are available for online video consultations to guide you through the process.
Q:What is the typical lead time and your Minimum Order Quantity (MOQ)?
A:
Our MOQ is 1 unit, making it easy for you to test our quality. For standard models, the lead time is usually 7-15 days. For large-scale projects or highly customized orders, the lead time is generally 25-35 days. We maintain a regular stock of core components to ensure rapid response to urgent maintenance needs.

Send Inquiry

*To:Nantong Saler Electric Co., Ltd.Nantong Saler Electric Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like